Loading...
HomeMy WebLinkAbout932 RIDGE RUNNER DR - SPECIAL INSPECTIONS - 6/4/201361301�N A.G. Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 932 Ridge Runner Drive Lot 6, Block 3 Trail Head Project Number 121898 Reference: A.G. Wassenaar Report Project Number 121898, Dated 9/24/2012 2180 South Ivanhoe Street,Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 www.agwassenaar.com June 03, 2013 As requested, the following portions of the foundation system were observed on the date(s) indicated below. It is our opinion that these portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis. Date: Observation: 05/21/13 Excavation and Footing Form Observation 05/23/13 Foundation Wall Reinforcing Steel Observation 05/30/13 Damp -Proofing Observation 05/30/13 Foundation Void Observation 05/30/13 Perimeter Drain Observation Sincerely, 32593 3 Kenneth R. BroseghbeP.E. Senior Engineer 13(3016Iq A.G. Wassenaar Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 932 Ridge Runner Drive Lot 6, Block 3 Trail Head Project Number 121898 Reference: A.G. Wassenaar Report Project Number 121898, Dated 9/24/2012 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303459-8100 Fax 303-756-2920 3-C 0 I www.agwassenaar.com August 29, 201 As requested, we performed a slab -on -grade observation at the subject site on the date(s) listed below. Our observations indicate the interior slab construction details are In general conformance with the recommendations provided in the soils report prepared for the subject site. If you have any questions regarding our services, do not hesitate to contact our office. Date: Observation: 08/21/13 Slab -On -Grade Observation 08/26/13 Slab -On -Grade Observation Sincerely, A. djWASSt q , , IN Kenneth K Broseg ,ni P.E. Senior Engineer c ) B(-3O Ie)14 A.G. Wassenaar Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 932 Ridge Runner Drive Lot 6, Block 3 Trail Head Project Number 121898 Reference: A.G. Wassenaar Report Project Number 121898, Dated 9/24/2012 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax 303-756.2920 QLC,� www.agwassenaar.com Revised August 29, 2013 As requested, the following portions of the foundation system were observed on the date(s) indicated below. It is our opinion that these portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis. Date: Observation: 05/07/13 Excavation Observation 05/21/13 Excavation and Footing Form Observation 05/23/13 Foundation Wall Reinforcing Steel Observation 05/30/13 Damp -Proofing Observation 05/30/13 Foundation Void Observation 05/30/13 Perimeter Drain Observation 08/06/13 Crawl Space Observation 08/21/13 Vapor Retarder Observation Sincerely, A. A WASS ,� Kenneth R. Broseghfni P.E. Senior Engineer