HomeMy WebLinkAbout932 RIDGE RUNNER DR - SPECIAL INSPECTIONS - 6/4/201361301�N
A.G.
Geotechnical and Environmental Consultants
D.R. Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 932 Ridge Runner Drive
Lot 6, Block 3
Trail Head
Project Number 121898
Reference: A.G. Wassenaar Report
Project Number 121898, Dated 9/24/2012
2180 South Ivanhoe Street,Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756-2920
www.agwassenaar.com
June 03, 2013
As requested, the following portions of the foundation system were observed on the date(s)
indicated below. It is our opinion that these portions of the foundation system were found to be in
substantial conformance with the foundation plan and requirements of the soil report for the subject
site. Observations were conducted on a periodic, on -call basis.
Date: Observation:
05/21/13
Excavation and Footing Form Observation
05/23/13
Foundation Wall Reinforcing Steel Observation
05/30/13
Damp -Proofing Observation
05/30/13
Foundation Void Observation
05/30/13
Perimeter Drain Observation
Sincerely,
32593
3
Kenneth R. BroseghbeP.E.
Senior Engineer
13(3016Iq
A.G. Wassenaar
Geotechnical and Environmental Consultants
D.R. Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 932 Ridge Runner Drive
Lot 6, Block 3
Trail Head
Project Number 121898
Reference: A.G. Wassenaar Report
Project Number 121898, Dated 9/24/2012
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303459-8100 Fax 303-756-2920
3-C 0 I www.agwassenaar.com
August 29, 201
As requested, we performed a slab -on -grade observation at the subject site on the date(s) listed
below. Our observations indicate the interior slab construction details are In general conformance
with the recommendations provided in the soils report prepared for the subject site. If you have any
questions regarding our services, do not hesitate to contact our office.
Date: Observation:
08/21/13 Slab -On -Grade Observation
08/26/13 Slab -On -Grade Observation
Sincerely,
A. djWASSt q , , IN
Kenneth K Broseg ,ni P.E.
Senior Engineer c )
B(-3O Ie)14
A.G. Wassenaar
Geotechnical and Environmental Consultants
D.R. Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 932 Ridge Runner Drive
Lot 6, Block 3
Trail Head
Project Number 121898
Reference: A.G. Wassenaar Report
Project Number 121898, Dated 9/24/2012
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756.2920
QLC,� www.agwassenaar.com
Revised August 29, 2013
As requested, the following portions of the foundation system were observed on the date(s)
indicated below. It is our opinion that these portions of the foundation system were found to be in
substantial conformance with the foundation plan and requirements of the soil report for the subject
site. Observations were conducted on a periodic, on -call basis.
Date:
Observation:
05/07/13
Excavation Observation
05/21/13
Excavation and Footing Form Observation
05/23/13
Foundation Wall Reinforcing Steel Observation
05/30/13
Damp -Proofing Observation
05/30/13
Foundation Void Observation
05/30/13
Perimeter Drain Observation
08/06/13
Crawl Space Observation
08/21/13
Vapor Retarder Observation
Sincerely,
A. A WASS
,�
Kenneth R. Broseghfni P.E.
Senior Engineer