HomeMy WebLinkAbout4703 PRAIRIE VISTA DR - SPECIAL INSPECTIONS - 5/6/2013DATE: May 6, 2013 y7®3 Prwxm Y 64to ADDRESS: Mr. Fran Garcia PARAISO CONSTRUCTION 2002 Westbourne Drive Loveland, CO 80538 SUBJECT: Inspection.of Caisson Drilling for Lot 1, Harmony Ridge, City of Fort Collins, Larimer County, Colorado CDS Project No. 12-6271 REFERENCED FOUNDATION PLAN: CDS Project No. 12-6271 On May 6, 2013, we visually observed the drilling operation of thirteen (13) of the twelve (12) inch diameter caissons for the residence under construction at the above referenced site. The caissons were located in the basement of the proposed residence. These caissons were drilled to a minimum depth of thirty-three (33) feet with a minimum penetration of twenty-six (26) feet into competent bedrock. The caisson holes were relatively clean and groundwater was present. The caissons were drilled in general conformance with the above referenced foundation plans. Three (3) #5 reinforcement bars were placed in the caisson holes prior to the placement of concrete. Concrete was placed by means of a pump truck. This operation was found to be in accordance with good construction practice and in accordance with the engineer's specifications. FOR AND ON BEHALF OF CDS ENGINEERING CORPO 14 Inspected by: Up�'GafFy ,2J, :tee 13 Robert R. Greenwald II, P. . SONAR 165 2nd Street S.W. o Loveland, CO 80537 0 (970) 667-8010 o Fax (970) 667-8024 o www.cds-eng.net 603011sk May 17, 2013 Mr. Fran Garcia B� PARAISO CONSTRUCTION 4-7 3 V-' f, 2002 Westbourne Drive >or Loveland, CO 80538 RE: Observation of Reinforcing Steel at Lot 1, Harmony Ridge, City of Fort Collins, Larimer County, Colorado CDS Project No. 13-6271 Dear Fran, On May 17, 2013, we visually observed the steel reinforcement in the wall forms for the residence under construction at the above referenced site. The reinforcement appears to be in general conformance with the foundation plan by CDS Engineering Corporation, Project No. 13- 6271, dated February 5, 2013. We also observed that a UFER ground was installed. Please contact our office if you have any questions concerning this information. FOR AND ON BEHALF OF CDS ENGINEERING COIU Observed by: �Q,PV'0 11CF� v P�GREfN•• Stc v :e 71 1LbIWyStof�i�+^'�t38428 ,b _ V Robert R. Greenwald o��,NA� 165 2nd Street S.W. o Loveland, CO 80537 0 (970) 667-8010 o Fax (970) 667-8024 a www.cds-eng.net May 24, 2013 Mr. Fran Garcia PARAISO CONSTRUCTION 2002 Westbourne Drive Loveland, CO 80538 RE: Observation of Perimeter Drain at Lot 1, Harmony Ridge, City of Fort Collins, Latimer County, Colorado CDS Project No. 13-6271 Dear Fran, On May 23, 2013, we observed the partially constructed exterior perimeter drain system and damp proofing at the above referenced site. The drain system consisted of corrugated flexible polyethylene pipe surrounded by gravel. The drain appeared to be located at to below the top of pier level and is to discharge into an interior sump pit. In addition, it appeared that the damp proofing adequately covered the foundation wall. As a result of our observations, the perimeter drain system appeared to be in general conformance with the engineer's recommendations. If you have any questions, feel free to contact our office. FOR AND ON BEHALF CDS ENGINEERING CA, Observed by Robert R. Greenwald II, •0 38428 SL�NAL ENG\�� 165 2nd Street S.W. o Loveland, CO 80537 e (970) 667-8010 o Fax (970) 667-8024 o www.cds-eng.net July 22, 2013 v��,. Mr. Fran Garcia PARAISO CONSTRUCTION 2002 Westbourne Drive Loveland, CO 80538 RE: Structural Floor for Residence at Lot 1, Harmony Ridge, City of Fort Collins, Larimer County, Colorado CDS Project No. 13-6271 Dear Fran, On July 12, 2013 we observed portions of the structural wood floor for the above rn referenced residence. The floor appears to be constructed per our recommendations; however, the beam saddle for the front beam that is attached to the exterior foundation wall, needs one additional %" Titen HD bolt installed. The foundation plan for the above referenced residence called out 2 x 12's for the back deck beam. It should have shown 2 — 2 x 12's. If you have any questions concerning this information, please contact our office. Respectfully, FOR AND ON BEHALF CDS ENGINEERING Q �% . • "Fig `� � %�Q °°•) 384280.E Robert R. Greenwald II, 165 2nd Street S.W. • Loveland, CO 80537 • (970) 667-8010 • Ff., (970) 667-8024 • www.cds-eng.net Mr. Fran Garcia PARAISO CONSTRUCTION 2002 Westbourne Drive Loveland, CO 80538 July 25, 2013 4703 PraA* o VISfu P / • RE: Bolt installation for the Structural Floor and the deck beam connection for the Residence at Lot 1, Harmony Ridge Subdivision, City of Fort Collins, Larimer County, Colorado CDS Project No. 13-6271 Dear Fran, On July 25, 2013, we observed the installation of the additional Titen HD bolt for the beam saddle for the W 1 Ox 12 steel beam on the south wall of the house. The bolt appeared to be installed per Simpson's recommendations. The attachments of the beam to the post at each deck post was observed, there appeared to be a minimum of three 5/8" bolts attaching the beam to the post at each post. If there was a splice in the deck beam, three 5/8" bolts are needed to connect the beam to the post. This appeared to have been done. If you have any questions concerning this information, please contact our office. Respectfully, FOR AND ON CDS ENGINE] "Greenwal 3 �. Ro�1 . ENGg� 165 2nd Street S.W. • Loveland, CO 80537 • (970) 667-8010 • Fax (970) 667-8024 a www.cds-eng.net