Temporary Certificate of Occupancy
Permit #: B1102250
Work Description: ADDITION OF 4376 SQUARE FEET AND RENOVATION TO EXISTING SPIRIT OF JOY
LUTHERAN CHURCH. RELOCATION OF EXISTING MODULAR BUILDING WILL REQUIRE A
SEPARATE PERMIT.
REQUIRES INSTALLATION OF REDUCED PRESSURE ASSEMBLY (RPA)BACKFLOW
PREVENTOR ON MAIN DOMESTIC WATER LINE AS IT ENTERS THE BUILDING; CERTIFIED
TESTER MUST TEST DEVICE AFTER INSTALLATION -->NORM MILL 970-416-2249
NMILL@FCGOV.COM OWNER AUTHORIZATION ON FILE.
This is to certify that the building, structure, or land located at 4501 S LEMAY AVE Fort Collins, CO has been
inspected and temporary occupancy is hereby authorized, effective on 0212412012 and conditional upon the
following requirements being completed and approved upon final inspection.
SW Eng Final-Requirementsto be Completed By:
I �J r-1
SW Erosion Final-Requirements'tO'bi Corpleted By
Soil Prep Certification'Requirements to be Completed By:-5/15/2012 �•
- ' ,/-022?W2 This site wilrr eeda sal amendm�tcompleted, "Soo ame�ndmenlcertificate�
WWW Irrigation Final Requirements to be Completed By:
�. /"
Zoning Final Requirements to tie Completed By: 03/23/2012
02232012 Landscape Escrow of $26,473.50 reed 2/2312012; Ok for TCO w/conditions: 1. Removeconstrudpn trailer, dumpster, office,
portsjohn, & ID sign. 2. Paint all wall mounted utitiiy boxes, meters, conduit matching surface color. 3. Paint all roof vents matching
roof color. 4. Complete parking lot with HC ramps, striping, etc. 5. Clean parking and sidewalk areas. 6. Install 2 - 5 gal. upright
Juniper that will grow to Yin height in front/side of the two areas where new ground mounted AC compressors are located in order
to screen units from public view.
If such work is not completed within the time set forth above and approved on final inspection, or unless the
a/avi/2
Date
cQo fc-�-.
Date of fssuan6e
NOTE: The issuance of this temporary certificate of occupancy will entitle the ownerto place City Utility service in the owner's name. Construction power rates
may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the Ctly Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name, utilities will continue to be fumished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.
02242012 09:02:18 AM Page 1 of 2
F6rt`Collins
Community Development & Neighborhood Services
281 N. College Ave
Fort Collins, CO 8o522
970.221.676o 970.224.6134 -fax
time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a
violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be
issued. Such violation is subject to a maximum fine of $1000.00 per day for every day of violation.
Contractor/Owner/Lessee
Authorized By
Date
Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the ownerto place City Utility service in the owners name. Construction power rates
may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owners name, utilities will continue to befumished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.
02f2412012 09:02:18 AM Page 2 of 2