Re: Construction Observation and Material Testing
Rams Crossing K2 - 914 West Lake Street
Fort Collins, Colorado
EEC Project No. 1 l 14078
Mr. & Mrs. Gower
13
EE
EARTH ENGINEERING
CONSULTANTS, LLC
As requested, during the period February 11 through February 23, 2013, Earth Engineering
Consultants, LLC (EEC) personnel provided construction observation and testing services for
Ram's Crossing K2 student housing project under construction on the north side of the existing
complex at 914 West Lake Street in Fort Collins, Colorado. Those services were provided on a
part-time basis and included observations and field density testing of subgrade materials as
described herein, and testing of cast -in -place concrete for the referenced project. The results of the
observations and testing services completed by EEC personnel during the referenced period are
included with this report.
During the referenced period, EEC personnel performed field density tests on prepared subgrade
materials within the exterior concrete flatwork areas that had been placed/prepared and compacted
prior to and/or during our site visits. The field density tests were completed at random locations and
elevations within the areas tested and were performed in general accordance with ASTM
Specification D6938. The field density test results and approximate locations of each test completed
during the referenced period are shown on the attached summary sheet. The field density test results,
conformed to the compaction requirement of at least 95% of standard Proctor maximum dry density.
During the referenced period EEC personnel observed and tested Portland cement concrete
delivered to the site for placement within the exterior concrete flatwork area as indicated on the
enclosed daily reports. Field testing performed on the plastic concrete included slump, air content,
unit weight, and concrete temperature. The ambient air temperature at the time of placement was
also recorded. A minimum of 5 (4-inch diameter by 8-inches in height) concrete test cylinders were
cast from representative samples on each respective date, for laboratory curing and compressive
4396 GREENFIELD DRIVE
WINDSOR, COLORADO 80550
(970)545-3908 FAX (970)663-0282
www.earth-engineering.com
EEC Project No. 1114078 Earth Engineering Consultants, LLC
Ram's Crossing K2
March 4, 2013
Page 2
strength testing. Results of the field and 7-day laboratory compressive strength tests results
performed during the referenced period are included herein, while the 28-days compressive strength
test results will be provided in separate reports as the test results become available.
We appreciate the opportunity to work with you on this project. If you have any questions
concerning this report, or if we can be of further service to you in any other way, please do not
hesitate to contact us.
Very truly yours,
lsultants, LLC
David A. Richer, P.E.
Senior Geotechnical Engineer
cc: Brinkman Construction - Mr. Sean Madland: sean.madlandObrinkmannartners.com
R4Architects — Mr. Matt Rankin: mattla7,r4arch.com
Larsen Structural Design — Mr. Blake Larsen, P.E.: Blake a,larsensd.com
EARTH ENGINEERING CONSULTANTS,LLC
SUMMARY OF FIELD DENSITY TESTS 40
Project Name: Ram's Crossing Project No: 1114078
Location: Fort Collins, Colorado
Proctor Desgrmtion
SF
Maximum Dry Density (pcf)
127.5
Opt'vnum Moist ve Content (%)
9.5%
Required Moisture Variance
N/A
Requ"ved Percent Compaction
95%
Laboratory Method
ASTM 069B
Date: March 2013
Note: Chars 6 ABC material was imported from Martin Marietta Materials' (formerly known as Wendel Sesworth Pit
e m
i
o m
r
o
o
r E
o z
Approximate Test Location / Notes
Field Test Results
u
c L
g j
'c'
i
o- a
Compliance with
Project Specs
EIev.ILiR
No.
Material
(Proctor)
Percem
Moisture
Dry
Density
Mosture
(Pass/
Fail)
%Comp.
(Pass/
Fail)
73
2/12
1
Entryway Subgrade-See Diagram
FSG
SF
3.1%
123.3
6.4%
97%
WA
Pass
74
2112
2
Entryway Subgrade - See Diagram
FSG
SF
2.6%
123.7
6.9%
97%
WA
Pass
COLOR DOSrAM
UNAWRWry
COLORAOOETAM
E.�/S1lNG C3UDR/VE UN/VAPY/lY
I PRO#CeED BULL 3v4QJ -�
L __a LJ ILL 7 _
J02/12-2
COLOMADC
I a
0I4 W. LAKE
01
P
LAAZEl KIEr
i
u
--
Field Density Test Location Diagram
Ram's Crossing - KZ Building - Fort Collins, Colorado
EEC Project #: 1 1 14078
North Fill, Subgrade, & Aggregate Base
No o S.M
EARTH ENGINEERING CONSULTANTS, INC.
Earth Engineering Consultants, LLC
Report of Cast -In -Place Concrete Tests
GENERAL INFORMATION
Placement Date: 2/13/2013
Test Set Number:
20
Placement Location: Sidewalk - Steps on E Side Entrance to New Building
Concrete Supplier. Aggregate Industries
Type of Placement:
Chute
Ticket Number. 60312563
Truck Number. 679
Mix Code: 6450100
Water Added on Site:
8 gals
Batch Time: 9:36 AM Sample Time: 10:15 AM
Yards: 11 of
11
Required 28 Day Compressive Strength (psi): 4000
EEC Technician:
ZJ
omments:
FIELD TEST DATA
TEST
RESULTS SPECIFICATIONS
Slump (inches)
ASTM C-143
3.26'
Air Content (%)
ASTM C-231
5.2%
Unit Weight (pcf)
Laboratory
143.7 —
Concrete Temperature (deg F)
ASTM C-1064
61° 90" Max
Air Temperature at Placement (de F)49°
g —
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C-39/C31)
Specimen
Number
Date
Tested
Age
(Days)
Maximum
Applied Load
founds
Area
(in 2)
Failure
Type
Compressive
Strength (psi)
Average
Compressive
Strength (psi)
20
B
02/20/13
7
68420
12.57
Shear
5440
5440
Project:
Project Number.
Ram's crossing K2 - New Student Housing Complex
1114078
EEC
Report Distribution:
Ram's Crossing: Chuck & Cheryl Gowler
Brinkman Construction:
Bob. Papish@bhnkmanpartners.com
Sean.Madland@bdnkmanpartners.com
r4Architects — Mr. Matt Rankin: matt@r4arch.com
Larsen Structural Design: blake@larsensd.com
City of Ft Collins: scicione@fcgov.com
Aggregate Industries
EARTH ENGINEERING
CONSULTANTS, LLC
Ram's Crossing at Campus West
914 West Lake Street
Fort Collins, Colorado 80521
Attn: Chuck and Cheryl Gower (walnutmain(a)att.net)
Re: Construction Observation and Material Testing - Compliance Summary Report
Rams Crossing K2 - 914 West Lake Street
Fort Collins, Colorado
EEC Project No. 1114078
Mr. & Mrs. Gower
As you are aware, during various construction phases for the referenced project, Earth
Engineering Consultants, (EEC) and our steel erection subcontractor (Inspex ndt.) personnel,
provided construction observation and testing services of requested items on a part-
time/periodic, as-needed/on-call basis as scheduled by the project's general contractor,
Brinkman Construction, Inc. as per the project specifications. Bi-monthly reports concerning
the services provided by EEC and Inspex ndt. personnel, were submitted to Ram's Crossing at
Campus West, (the owner's representative), Brinkman Construction, (the general contractor),
and to the project design team members' attention during the appropriate time period(s) as the
test results became available. We have recently been asked by the project superintendent with
Brinkman Construction to provide a summary and/or compliance letter addressing the services
performed by EEC and our subcontractor's personnel regarding but not limited to the
foundation system and interior floor slab structural related elements along with the -structural.
steel erection components.
During the foundation construction phase for the referenced project, EEC personnel provided
site observations and field density testing of over -excavated and moisture conditioned on -site
subsoils/replaced as engineered fill material, placement and compaction efforts to stabilize the
foundation bearing stratum at isolated location by means and methods of embedding recycled
concrete/pit-run material into the underlying subsoils, as well field density testing of approved
imported structural fill material within the foundation alignments, interior floor slab areas,
backfill of foundation walls, and within on -site exterior flatwork areas, as recommended in the
project -specific "Geotechnical Subsurface Exploration Report" prepared by EEC, Project
4396 GREENFIELD DRIVE
WINDSOR, COLORADO 80550
(970) 545-3908 FAX (970) 663-0282
www.earth-encineerina.com
Earth Engineering Consultants, LLC
EEC Project No. 1114078
Compliance Summary Report
Ram's Crossing K2 Building
March 4, 2013
Page 2
No. 1112059, and dated October 5, 2011 to achieve the maximum net allowable bearing
pressure of 2,500 psf.
EEC personnel provided reinforcement observation of the foundation system including the
conventional spread footings placed on approved engineered/controlled fill material, cast -in -
place foundation walls, and interior floor slab. EEC personnel also provided testing of all cast -
in -place concrete for the foundation system, and interior floor slabs, along with the exterior
concrete flatwork adjacent to the building.
Based on our review of the outlined testing, as directed by the general contractor and
completed by EEC personnel on an as -needed basis, the final field density test results within
the building footprint and associated exterior flatwork, and site utilities, met the project
compaction requirements for fill materials placed and compacted to redevelop the foundation
bearing strata, interior floor slab elevations, backfill placed adjacent to foundation walls and
on -site utility installation trenches. Laboratory compressive strength tests completed on the
cast -in -place concrete for all foundation elements and floor slabs conformed to the project
specified minimum 28-day compressive strengths requirements.
Observations of reinforcement within the foundation system for the project, (i.e., the cast -in -
place conventional spread footings, cast -in -place foundation walls), were completed by EEC
personnel and reports were submitted to your attention during the appropriate periods as the
results became available. Based on our review of the outlined observations, we believe the
reinforcement within the foundation system and structural relative elements were placed and
constructed in general compliance with the project plans and specifications and associated
RFI's specific to the project.
Observations for the structural steel erection, welding and bolt connections were completed by
Inspex ndt., a subcontractor to EEC, and reports were submitted to your attention during the
appropriate period as the results became available. Based on information received, we believe
the structural steel, weld, and bolted connections, as reported by Inspex ndt. were. in general
compliance with the project plans and specifications.
EEC Project No. 1114078
Compliance Summary Report
Ram's Crossing K2 Building
March 4, 2013
Page 3
Earth Engineering Consultants, LLC
We appreciate the opportunity to be of service to you on this project. If you have any questions
regarding this report or if we can be of further service to you in any other way, please do not
hesitate to contact us.
Very truly yours,
Earth En ineering Consultants, LLC
27712
�-l3
David A. Richer, P.E.
Senior Geotechnical Engineer
cc: Brinkman Construction - Mr. Sean Madland: sean.madland(a),brinkmanuartners.com
Brinkman Construction — Mr. Jeremy Subia: Jeremy.Subiaobrinkmanpartners.com
Brinkman Construction — Mr. Jason Vaughn: iason.vauahnObrinkmannartners.com
R4Architects — Mr. Matt Rankin: mattna,r4arch.com
Larsen Structural Design — Mr. Blake Larsen, P.E.: blake(o)larsensd.com