HomeMy WebLinkAbout456 SAN JUAN DR - DISCLOSURES - 6/1/2012City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, seethe "Residential New
Construction Mechanical Systems Testing Gulde." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Measured value to
OOIOF key
Target or limit
compare with target o
Pans
}. `: �'
Caution
Other data
Bath exhaust
Airflow measurement metho bl-lgw box _ Flow collar
_ Passive flow hood Pilot tube traverse
Temperature of air ihroug Indicated flow to Volumetric flow muftipli r
measurement too 7 F Q5000%air temperature (.098
Measured Exhaust Airflow
Minimum
Operation
Indicated
Exhaust Pickup Location
In[ortnlitant or
AMlow,
Flow
Flow
Volumetric Flow
PassFall
Requirement
(CFM 5,000')
Continuous
(CFM)
(CFM 5000')
master Bath
Klebimmit _Conlin
50 cfm
76
83.448
❑.,
U.L. Bath
97termi, —Conlin
50 cfm
72
79.056
❑ `
_Intermit _Conlin
❑
p
Intermit Conlin
❑
❑,'...i...,
Intermit Conlin
❑
❑'.n
Intermit Conlin
❑
❑
Intermit _Conlin
❑
❑+
Intermit Conlin
❑
❑',`'
Kitchen exhaust
Oven fuel —Gas
ctrle
Exhaust airflow Minimum exhaust airflow requirementCFM 5000'
Operation _ Intermittent _ Continuous
Measured airflow
Airflow measurement method — Flow box _ Flow collar
Passive Oow hood Pilot tube traverse
Temperature of air through 11I�1IF Indicated flow to Volumetric flow multiplier
measurement tool Q 5000'. air temperature
Indicated Flow I �FM Volumetric flovi 5000' ❑ Pass ❑ Fall
Testing notes (fan speed, masklni
flow out of range, ...
Mechanical Systems Perormence rasing Submittal FormVQatQOb2t 1 of a
Systems other than sub -structural floor exhaust
Minimum exhaust airflow requirement
Si
FM 5000'
Indicated to
Massu red AIr11ow
Volumetric
Design Airflow
Measurement
Measurement Location f
Flow
Indicated Flow Volumetric
(CFM 5000')
Method
Air Temperature(F)
Multiplier
(CFM) Flow
Pass/Fall
(CFM 5000')
low box
Total exhaust airflow
_ Passive flow hood
Flow collar
Pilot tube traverse
Bath
1.098
72
79.056
Flow collar
.a-^
Total supply airflow
_ Pilot tube traverse
r_
_ Flow box
Passive flow hood
For systems In which supply airflow Is clrculatedlbthe air handier fan, fan speed (or measureman Heat Cooling Continuous fan
Balanced alrflow In balanced systems
Average of measured suppl
and exhaust flow CFM 5000'
Sub -structural floor exhaust
Design airflow
❑ Pass
E:::=C FM 5000'
Target flow rang
(average 415%) to� CFM 5000'
,. Fail
Measured Measured airflow
Airflow measurement metho — Flow boa _ Flow collar
_ Passive flow hood _ Pilot tube traverse �}
Temperature of air through F Indicated flow to Volumetric flow multiplier I
measurement tool ®SOaO', air temperature
Indicated flow CFM Volumetric flow CFM 5000' ❑ Pass ❑ Fail
Indicated flow to Volumetric flow multiplier 1 098 5000', air temperature
Maximum Allowed Duct Leakage Measured Duct Loakace
Test Parameter and Conditions
Normalized Leakage
(CFM251100 ef)
Absolute
Leakage
CFM25)
Indicated Flow
CFM25)
Volumetric
Flow
(CFM25 5000')
Measurement
Timing
Air Handler
Pass/Fail
Total leakage
Rough -in
Excluded
4
Total leakage
Rough -in
Included
6
Total leakage
Complete
Included
12
E.
Leakage to outdoorsC
iniplele
Included 1
8
1230 142
761171 141.
a
Macbanical Syafeme Performance Tealing Submilmi V20120321 2 of
Filter type
Bran slaIRIC
Static pressures (OPTIONAL)
Mode: Heating
&poling
_ Continuous Fan
Fan speed tap
Humidifier bypass( pen _Closed
b�,.All registers open
Zone dampers open
Ap filter =
Dal
Type l styl Disposable Thlctnes 3' Inches MERV(optional)I 1
P=
Cooling: Measured air flow throu If indoor coil usirg flow grid
o31
;PAC coil ='�ay
11 li ry P=+
i 1t111 I_ rKY11
Il nl!Ilm ::
u.11iu r lour
❑p Total ESP ® •fir ! -v1,i
fJ15 t Gt157 �.dtl
"45T)o
Design cooling airflo 1320 CFM 5000' Target airflow limit (design +1. 15%) 1122 to 1518 1 CFM 5000'
Measured alAlow,
Cooling tan speed tap High
Temperature of air throng
measurement too 71 F
NSOP r31.5 1 Pa TFSOP 3.3 Pa
Measured airflow, no adjustments or correction CFM
Volumetrlc flo 1471.32 CFM 5000'_ Pass
Flow grid plate sh, 16 _ 20
Indicated flow to Volumetric flow mulNpli r
Q 5000'. air temperature 1 .098
Flow Resistance Correction Facto DG 700
Adjusted (indicated) alrflo 1340 CFM
❑ Fail
Heating: Gas manifold pressure
OEM manifold pressor 3 3 IWC Target manifold pressure limits (spec +f-5%) � to� IWC
specification, 5000 ...(
Measured manifold pressur 3,32 IWC tFJ Pass ❑ Fell
Heating: Temperature rise
OEM temperature rise limit
Measured temperature rise
Return air -]) F
Temp rise Q9 F
Supply air 1 Zp F
v— Pass [] Fail
Caution: Tamp rise within
10 F of lop of range
Mechanlcal systems Perfermanoe Testlne SubmlttatFe V20170321 3 of 6
(This section under development, not yet being enforced)
Supply alr flows (This section under development, not yet being enforced)
Pressure balance
Pressure difference limit, room -to -core -$ t0 +•3 Pa
Room
Measured pressure
drop (pa)
pass
Fall
master Bedroom
-3.0
❑
Bedroom 2 Middle
-0.5
❑
Bedroom 3 Front
-5.9
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Mechanical System. Performance Testing SubmltteePo V20120321 4ate
Outdoor temperature IF
Worst -case depressurizat
i
o
n
testing
Mouse setup
Tested appliances
_ R of bath fans on These doors are closed:
_ Vented range hood on
_ Clothes dryer on ---
Air handler on
Other tans on
Appllenc
Typi
Locate
CAZ pressure
BPI depressurizalion limit Pa wrt outside
Measured net CAZ dopressurizatlonlea wrt outside
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit seconds
Measured spillage duration seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit Pa wrt CAZ
Measured Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit ppm
Measured CO ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
_Draft -hood
Induced -draft
_Draft -hood
Induced -draft
_Draft -hood
Induced -draft
60
60
60
❑
ass
all
❑
Pass
II
❑
ass
all
100
100
100
❑
ass
Q:. ail
❑
Pass
II
❑
aae
k all
[Iaution
❑
Caution
Elaulion
Mechanical Syatema Performance reeling SubmitlV Fo V20120321 5 of 6
System controls operating per design Intent
Approved Agency it
Name (print)
Title
Company
Signature and Date
Localexhaust
❑
Whale-homemrtII.U.n
El'
Sub -structural floor exhaust tj
Heating
E1
Cooling
04
crinician perrorming inspection as testis q accurnentea on MIS Torm)
Paul fligman
Energy Rater
Thermal Concepts/ Allied
HVAC contractor (Fort Collins license holder)
Name (print)
Title
Company
Signature and Date
Mechanical Systems Performance Testing SimminterFO V20120321 9.16