Loading...
HomeMy WebLinkAbout456 SAN JUAN DR - DISCLOSURES - 6/1/2012City of Fort Collins Residential Mechanical Systems Performance Testing Submittal Form This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, seethe "Residential New Construction Mechanical Systems Testing Gulde." The guide and this form may be periodically updated; check the Building Services web site for the current version. This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O. Measured value to OOIOF key Target or limit compare with target o Pans }. `: �' Caution Other data Bath exhaust Airflow measurement metho bl-lgw box _ Flow collar _ Passive flow hood Pilot tube traverse Temperature of air ihroug Indicated flow to Volumetric flow muftipli r measurement too 7 F Q5000%air temperature (.098 Measured Exhaust Airflow Minimum Operation Indicated Exhaust Pickup Location In[ortnlitant or AMlow, Flow Flow Volumetric Flow PassFall Requirement (CFM 5,000') Continuous (CFM) (CFM 5000') master Bath Klebimmit _Conlin 50 cfm 76 83.448 ❑., U.L. Bath 97termi, —Conlin 50 cfm 72 79.056 ❑ ` _Intermit _Conlin ❑ p Intermit Conlin ❑ ❑,'...i..., Intermit Conlin ❑ ❑'.n Intermit Conlin ❑ ❑ Intermit _Conlin ❑ ❑+ Intermit Conlin ❑ ❑',`' Kitchen exhaust Oven fuel —Gas ctrle Exhaust airflow Minimum exhaust airflow requirementCFM 5000' Operation _ Intermittent _ Continuous Measured airflow Airflow measurement method — Flow box _ Flow collar Passive Oow hood Pilot tube traverse Temperature of air through 11I�1IF Indicated flow to Volumetric flow multiplier measurement tool Q 5000'. air temperature Indicated Flow I �FM Volumetric flovi 5000' ❑ Pass ❑ Fall Testing notes (fan speed, masklni flow out of range, ... Mechanical Systems Perormence rasing Submittal FormVQatQOb2t 1 of a Systems other than sub -structural floor exhaust Minimum exhaust airflow requirement Si FM 5000' Indicated to Massu red AIr11ow Volumetric Design Airflow Measurement Measurement Location f Flow Indicated Flow Volumetric (CFM 5000') Method Air Temperature(F) Multiplier (CFM) Flow Pass/Fall (CFM 5000') low box Total exhaust airflow _ Passive flow hood Flow collar Pilot tube traverse Bath 1.098 72 79.056 Flow collar .a-^ Total supply airflow _ Pilot tube traverse r_ _ Flow box Passive flow hood For systems In which supply airflow Is clrculatedlbthe air handier fan, fan speed (or measureman Heat Cooling Continuous fan Balanced alrflow In balanced systems Average of measured suppl and exhaust flow CFM 5000' Sub -structural floor exhaust Design airflow ❑ Pass E:::=C FM 5000' Target flow rang (average 415%) to� CFM 5000' ,. Fail Measured Measured airflow Airflow measurement metho — Flow boa _ Flow collar _ Passive flow hood _ Pilot tube traverse �} Temperature of air through F Indicated flow to Volumetric flow multiplier I measurement tool ®SOaO', air temperature Indicated flow CFM Volumetric flow CFM 5000' ❑ Pass ❑ Fail Indicated flow to Volumetric flow multiplier 1 098 5000', air temperature Maximum Allowed Duct Leakage Measured Duct Loakace Test Parameter and Conditions Normalized Leakage (CFM251100 ef) Absolute Leakage CFM25) Indicated Flow CFM25) Volumetric Flow (CFM25 5000') Measurement Timing Air Handler Pass/Fail Total leakage Rough -in Excluded 4 Total leakage Rough -in Included 6 Total leakage Complete Included 12 E. Leakage to outdoorsC iniplele Included 1 8 1230 142 761171 141. a Macbanical Syafeme Performance Tealing Submilmi V20120321 2 of Filter type Bran slaIRIC Static pressures (OPTIONAL) Mode: Heating &poling _ Continuous Fan Fan speed tap Humidifier bypass( pen _Closed b�,.All registers open Zone dampers open Ap filter = Dal Type l styl Disposable Thlctnes 3' Inches MERV(optional)I 1 P= Cooling: Measured air flow throu If indoor coil usirg flow grid o31 ;PAC coil ='�ay 11 li ry P=+ i 1t111 I_ rKY11 Il nl!Ilm :: u.11iu r lour ❑p Total ESP ® •fir ! -v1,i fJ15 t Gt157 �.dtl "45T)o Design cooling airflo 1320 CFM 5000' Target airflow limit (design +1. 15%) 1122 to 1518 1 CFM 5000' Measured alAlow, Cooling tan speed tap High Temperature of air throng measurement too 71 F NSOP r31.5 1 Pa TFSOP 3.3 Pa Measured airflow, no adjustments or correction CFM Volumetrlc flo 1471.32 CFM 5000'_ Pass Flow grid plate sh, 16 _ 20 Indicated flow to Volumetric flow mulNpli r Q 5000'. air temperature 1 .098 Flow Resistance Correction Facto DG 700 Adjusted (indicated) alrflo 1340 CFM ❑ Fail Heating: Gas manifold pressure OEM manifold pressor 3 3 IWC Target manifold pressure limits (spec +f-5%) � to� IWC specification, 5000 ...( Measured manifold pressur 3,32 IWC tFJ Pass ❑ Fell Heating: Temperature rise OEM temperature rise limit Measured temperature rise Return air -]) F Temp rise Q9 F Supply air 1 Zp F v— Pass [] Fail Caution: Tamp rise within 10 F of lop of range Mechanlcal systems Perfermanoe Testlne SubmlttatFe V20170321 3 of 6 (This section under development, not yet being enforced) Supply alr flows (This section under development, not yet being enforced) Pressure balance Pressure difference limit, room -to -core -$ t0 +•3 Pa Room Measured pressure drop (pa) pass Fall master Bedroom -3.0 ❑ Bedroom 2 Middle -0.5 ❑ Bedroom 3 Front -5.9 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Mechanical System. Performance Testing SubmltteePo V20120321 4ate Outdoor temperature IF Worst -case depressurizat i o n testing Mouse setup Tested appliances _ R of bath fans on These doors are closed: _ Vented range hood on _ Clothes dryer on --- Air handler on Other tans on Appllenc Typi Locate CAZ pressure BPI depressurizalion limit Pa wrt outside Measured net CAZ dopressurizatlonlea wrt outside OK (less negative) I Caution (more negative) Spillage BPI maximum limit seconds Measured spillage duration seconds Pass = duration not exceeding limit Draft pressure BPI limit Pa wrt CAZ Measured Pa wrt CAZ Pass = pressure more negative than limit CO concentration in undiluted flue gas BPI maximum limit ppm Measured CO ppm Pass = CO level not exceeding limit Caution = CO level 25 to 100 ppm _Draft -hood Induced -draft _Draft -hood Induced -draft _Draft -hood Induced -draft 60 60 60 ❑ ass all ❑ Pass II ❑ ass all 100 100 100 ❑ ass Q:. ail ❑ Pass II ❑ aae k all [Iaution ❑ Caution Elaulion Mechanical Syatema Performance reeling SubmitlV Fo V20120321 5 of 6 System controls operating per design Intent Approved Agency it Name (print) Title Company Signature and Date Localexhaust ❑ Whale-homemrtII.U.n El' Sub -structural floor exhaust tj Heating E1 Cooling 04 crinician perrorming inspection as testis q accurnentea on MIS Torm) Paul fligman Energy Rater Thermal Concepts/ Allied HVAC contractor (Fort Collins license holder) Name (print) Title Company Signature and Date Mechanical Systems Performance Testing SimminterFO V20120321 9.16