Loading...
HomeMy WebLinkAbout1809 FROMME PRAIRIE WAY - SPECIAL INSPECTIONS - 4/18/2012TD ST ENGI N April 18, 2012 Philgreen Construction Inc. 1414 Blue Spruce Dr., Unit B- Fort Collins, CO 80524 Observation Report Project: Harmony Ridge Triplex Location: Lots 57-59 Harmony Ridge TDSE Project No.: 11-058 Observation Date: April 2nd, 9P and 17d' 2012 Plans/Details: Plans by TD Structural Engineering Inc. dated December 27, 2011 Items Observed: footing and foundation sizes and reinforcing, damp -proofing and perimeter drain Notes: Observations indicate the footing and foundation sizes and reinforcing are in substantial conformance with the plans as noted above. In addition the electrode had been placed in substantial conformance with the recommendations by NEC. NG I L Observations indicate the exterior basement foundation walls have been adequately damp -proofed and covered with 2" of rigid insulation. In addition a perforated pipe was placed around the exterior perimeter of the basement foundation walls and sloped to a sump and pump system in each individual unit. In my opinion the perimeter drain had been placed in accordance with the recommendations outlined in the geotechnical report dated December 6, 2011 by Earth Engineering Company, Inc. Sincerely, Wendy Thomas President TD Structural Ei ,65�*'�pOR F(3 S�-' y' O; ;= NOMAq ".roc o '� Z 38161 O' ;, ..`�� TD 5tructural Engmeenng, Inc. 1 2909 Oxford Ct., Fort Colhn5, CO 80525 1 970.312.1 140 1 www.td5tructural.com