Loading...
HomeMy WebLinkAbout600 ROLLAND MOORE DR - SPECIAL INSPECTIONS - 9/10/2012Pacific Consulting Engineers 2150 Bell Ave., Suite 145 • Sacramento, CA 95838 • (916) 564-6028 • Fax: (916) 564-6029 e-mail ddahmenoce@aol.com September 10, 2012 �O`�(1n i'ioor Dr Cale Fitch Campus Crest Group 2101 Perennial Lane Fort Collins, CO 80525 RE:. Alteration of the 24 x 60 modular building The 24 x 60 Modspace modular building was designed for placement with interior ridge beam columns located at 1 l'-5" and 29' 4" from the front or hitch end of the building. Reviewing the plans and pictured supplied to me, the center ridge beam column support has been removed. The existing ridge beam will span 31'. To retain the structural integrity of the roof framing and ridge beam, install 2 — 4 x 4 columns ( one on each module) in the wall at the kitchen area. Secure the new 4 x 4 columns to the floor and the ridge beams with Simpson or equal post and base brackets. It appears the existing 4 x 4 ridge beam column supports at the 11'-5" from the front location are framed into The new interior framing. The intent is to reduce the open ridge beam span to 31' or less. OQcee'� David A. Dahmen PE v,, f, to1,3110�0