Loading...
HomeMy WebLinkAbout4315 S MASON ST - SPECIAL INSPECTIONS - 9/7/2012ADVANCED ENGINEERING, LLC STRUCTURAL DRAINAGE DRAFTING September 7, 2012 Brett Abernathy Western Skies Construction P.O. Box 452 Windsor, CO 80550 RE: 30' x —50' Prep Building at 4315 S. Mason Street, Ft. Collins, Colorado Advanced Engineering, LLC Project Number 1372-07-OIB Dear Mr. Abernathy: On July 18, 2012 we visually observed the pilaster excavations and reinforcing for the foundation of the new pre -fabricated metal building being constructed at the above referenced site. It is our opinion the excavation dimensions and reinforcing were in general conformance with our Foundation Plan, Project Number 1372-07-01A. On August 8, 2012 we visually observed the metal framing of the building. It is our opinion the framing has been erected in general conformance with the manufacturer's plans, American Buildings Company drawing number 61659501. The conclusions presented in this letter are based on a visual review of portions of the described structure, your directions and the referenced plans. Our review was limited to the structural items described in this letter, and is not intended to cover mechanical, electrical, environmental, mold, site grading, geotechnical or architectural features of the building. Thank you for the opportunity to Sincerely, Advanced Engineering, Jason E. Baker, P.E. se e(youu�,feelNfree to call if you have any questions. 0 REG�S .T JQ' O • •E' g•' (c 3 739 o`��S1ONA�O- \ 146 Barberry Place, Loveland, Colorado 80537 Telephone 970-278-1909 Fax 970-278-1910