Attn: Chuck and Cheryl Gower
Re: Construction Observation and Material Testing
Rams Crossing at Campus Remodel - Entryway Additions
914 West Lake Street
Fort Collins, Colorado
EEC Project No. 1114078
Mr. & Mrs. Gower:
As requested by the general contractor, Brinkman Construction, during the period of
October 3 through October 15, 2011, Earth Engineering Consultants, Inc. (EEC) personnel
provided construction observation and testing services for the referenced project. Those
services were provided on a part-time basis and included a foundation excavation
observation for the east entryway improvements, reinforcement observations for the
footings, stem wall, and pilasters in conjunction with the east entryway structure, and testing
of cast -in -place concrete for the referenced project. The results of the observation
completed by EEC personnel are included with this report.
Foundation Excavation Observation — East Entryway
On October 12, 2011, a representative from EEC visited the site to observe foundation
bearing materials for the east entryway structure planned for construction at the referenced
site. At the time of our site visit, the foundation excavation for the canopy structure footing
pads and grade beam adjacent to the existing building, (please refer to the site diagram
included herein for reference purposes), had been excavated to approximate foundation
bearing elevations. The soil profile noted within the excavation generally consisted of sandy
lean clay transitioning to clayey sand. A hand auger boring was completed within the
foundation excavation by EEC personnel to a depth of approximately 3 feet below proposed
foundation bearing level. Dynamic cone penetrometer testing indicated the cohesive to
slightly cohesive subsoils were medium stiff in consistency. The soils observed within the
excavations were generally consistent with the assumed "foundation bearing capacity"
materials as noted on the approved structural drawings and are capable of supporting the
4396 GREENFIELD DRIVE
WINDSOR, COLORADO 80550
(970) 545.3908 FAX (970) 663-0282
Earth Engineering Consultants, Inc.
Rams Crossing at Campus Remodel
November 2, 2011
Page 2
structure using a net allowable maximum bearing pressure of 1,500 psf. No groundwater
was encountered within the base of the excavation.
Care should be taken during construction to avoid disturbing the bearing materials.
Materials that are loosened or disturbed by the construction activities or materials that
become dry and desiccated or wet and softened should be removed and replaced prior to
placement of foundation concrete.
Foundation Reinforcement Observations and Cast -in -Place Concrete TestiM
During the referenced period, EEC personnel conducted site visits on October 12, and 14,
2011, to perform visual observations of the reinforcing steel placed within the east entryway
site improvements, (i.e., continuous spread footing alignments, column pad footings, stem
walls, and pilasters), prior to placing foundation concrete as indicated herein. A summary of
the observations is included with this report. Any discrepancies of reinforcement, if noted
on the daily observation report were brought to the attention of the project's construction
management consultant, Brinkman Construction, and the reinforcement subcontractor, Red
Willow, during the initial site visits and corrections/modifications were addressed
accordingly prior to placement of the foundation concrete. Clearances and lap lengths,
where applicable, were checked and appeared to meet the minimum requirements. The
reinforcement for the portions of the foundation system observed by EEC personnel on the
date as noted herein, appeared to be in general accordance with the structural details as
presented on project plans and supplemental ASI schematics provided to us by Brinkman
Construction.
During the referenced period, EEC personnel observed and tested Portland cement concrete
delivered to the site for placement within the foundation elements as indicated on the daily
reports. Field testing performed on the plastic concrete included slump, air content, and
concrete temperature. The ambient air temperature at the time of placement was also
recorded. Concrete test cylinders were cast from representative samples for laboratory
curing and compressive strength testing. Results of the field and 7-day laboratory
compressive strength test results performed during the referenced period are included herein,
while the 28-day compressive strength results will be provided under separate cover when
the results become available.
Earth Engineering Consultants, Inc.
Rams Crossing at Campus Remodel
November 2, 2011
Page 3
We appreciate the opportunity to work with you on this project. If you have any questions
concerning the enclosed information, or if we can be of further service to you in any other
way, please do not hesitate to contact us.
Very truly yours,
Earth Engineering Consultants, Inc.
2T112
L z-JJ
David A. Richer, P.E.
Senior Geotechnical Engineer
cc: Brinkman Construction Mr. Evan Worsley: Evan.Worsley(cbbrinkmanpartners.com
Mr. Jim Ciesla: Jim.CieslaObrinkmanpartners.com
r4Architects — Mr. Matt Rankin: matt(@r4arch.com
Larsen Structural Design — Mr. Blake Larsen, P.E.: blake(cDlarsensd.com
EARTH ENGINEERING CONSULTANTS, INC.
REINFORCEMENT OBSERVATIONS - QC Period October 3 - October 15, 2011 (914 West Lake Street - RAM'S CROSSING REMODEL)
Footing/Pad Schedule Wor
Size (Width, Length and
Horizontal Reinforcement
Vertical Reinforcement Steel /
Other Reinforcement 8/or
Date
Location/Gridline
Foundation System
Thickness), if Applicable
Steel
Dowels (as noted)
Comments
Approximate gridline C-8 to D-8,
10-inches in depth by 16-inches
#4 vertical 7-6—hook" dowels with 8"
as per detail 2/S2.3 on Sheet
continuous footing alignment
Continuous Spread footing
in width continuous spread
two (2) continuous #5 rebar
horizontal component into footing,
S1.1 and S2.3 of structural
adjacent to the existing building -
footing
along footing alignment
alternating every 4-feet on -center
drawings
see Foundation Plan
Exterior column pads at
4-foot by 4-foot square pads by
5 # 5 rebar each -way bottom
8 #4 vertical 2'-6—hook" dowels with 8"
as per detail 1/S2.1 and ASI-
10/12/2011
approximate gridlines C-9, C-10, D-
Column Footing Pads
10-inches in depth
mat
horizontal component into footing, 3 per
3
9, and D-10, see Foundation Plan
each face
ASI No. 3 strip footings at
12-inches in depth by 16-inches
#4 vertical 2-6—hook" dowels with 8"
as per details 2/S2.3 on
approximate gridlines C-9 to C-9.4,
Continuous Spread footing
in width continuous spread
two (2) continuous #5 rebar
horizontal component into footing,
Sheet S1.1 and S2.3 of
and D-9 to D-9.4, see foundation
footing
along footing alignment
alternating every 4-feet on -center
structural drawings and ASI-3
plan
Pilasters at C-9, C-10, D-9, and D-
22 - 8" square 16-inches in
Each pilaster reinforced with eight (8) #4 vertical rebar from footing pad
Pilasters
width by approximately 3-
and #4 horizontals ties at 12-inches on -center, with 2 #4 ties at top 3-
as per detail 1/S2.1
10, see Foundation Plan
feetinheight
inches
10/14/2011
Foundation walls for continuous
2#4 rebar top and bottom and
as per detail 2/S2.3 on Sheet
spread footing alignments, see
foundation stem walls
8-inches in width
#4 rebar 12-inches on -center
#4 rebar 12-inches on -center
S1.1 and S2.3 of structural
Foundation Plan
full -height
drawings
EEC Client: Chuck and Cheryl Gowler c/o Ram's Crossing at Campus West
Project: Ram's Crossing - Entryway Remodel Improvements
Location: 914 West Lake Street - Fort Collins, Colorado
EEC Project No. 1114078 Sheet No. 1
. c,
Earth Engineering Consultants, Inc.
Report of Cast -in -Place Concrete Tests
GENERAL INFORMATION
Placement Date: 10/12/2011
Test Set Number:
1
Placement Location: Footings - E of Door, SE Side of Buildin
Concrete Supplier: Lafarge
Type of Placement:
Hand
Ticket Number: 75144569
Truck Number: 4780209
Mix Code: RMXCE30DC5J
Water Added on Site:
None
Batch Time: 2:38 PM Sample Time: 3:10 PM
Yards: 3.5 of
3.5
Required 28 Day Compressive Strength (psi): 3000
EEC Technician:
JE
Comments:
FIELD TEST DATA
TEST
RESULTS SPECIFICATIONS
Slump (inches)
ASTM C-143
4"
Air Content (%)
ASTM C-231
6.3%
Unit Weight (pcf)
Laboratory
Concrete Temperature (deg F)
ASTM C-1064
_'•
700 90°Max
Air Temperature at Placement (de F)
78°
Comments:
11
:1
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C-39/C-31)
Specimen
Number
Date
Tested
Age
(Days)
Maximum
Applied Load
founds
Area
inZ
Failure
Type
Compressive
Stren th si)
Average
Compressive
Strength (psi)
1
B
10/19/11
7
46740
12.57
Shear
3720
3720
Project: Ram's Crossing - Entryway/Remodel of Existing Building
Project Number: 1114078 Report Distribution:
Ram's Crossing: Chuck & Cheryl Gowler
Brinkman Construction:
Evan.Worsley@brinkmanpartners.com
Jim.Ciesla@brinkmanpartners.com
r4Architects — Mr. Matt Rankin: matt@r4arch.com
Larsen Structural Design: blake@larsensd.com
bernie.lucero@lafarge-na.com
gary.wood@lafarge-na.com
alan.jones@lafarge-na.com
Earth Engineering Consultants, Inc.
Report of Cast -in -Place Concrete Tests
GENERAL INFORMATION
Placement Date: 10/14/2011
Test Set Number:
2
Placement Location: Footing - Directly E of E Entryway
Concrete Supplier: Lafarge
Type of Placement:
Hand
Ticket Number: 75144655
Truck Number: 4780304
Mix Code: RMXGE40DC5W
Water Added on Site:
None
Batch Time: 2:56 PM Sample Time: 3:40 PM
Yards: 5 of
5
Required 28 Day Compressive Strength (psi): 3000
EEC Technician:
KRS
Comments:
11
FIELD TEST DATA
TEST
RESULTS SPECIFICATIONS
Slump (inches)
ASTM C-143
5.5"
Air Content (%)
ASTM 0-231
_ _
7.2%
Unit Weight (pcf)
Laboratory
Concrete Temperature (deg F)
ASTM C-1064
_
650 90°Max
Air Temperature at Placement (deg F)
60°
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C-39/C-31)
Specimen
Number
Date
Tested
Age
(Days)
Maximum
Applied Load
(pounds)
Area
(in2)Type
Failure
Co;thcA
St
Average
Compressive
Stren th (psi)
2
B
10/21/11
7
35620
12.57
Shear
2830
2830
Project: Ram's Crossing - Entryway/Remodel of Existing Building
Project Number: 1114078 Report Distribution:
Ram's Crossing: Chuck & Cheryl Gowler
Brinkman Construction:
Evan.Worsley@brinkmanpariners.com
Jim.Clesla@brinkmanpartners.com
MArchitects — Mr. Matt Rankin: matt@r4arch.com
Larsen Structural Design: blake@larsensd.com
bernie.lucero@lafarge-na.com
gary.wood@lafarge-na.com
alan.jones@lafarge-na.com