Loading...
HomeMy WebLinkAbout630 SMITH ST - SPECIAL INSPECTIONS - 8/17/2006d90 &C) 3 5-90 Excavation Quality Assurance Observation (Open -Hole) Per the clients request, a representative of SECURF has visually observed the soils exposed within the excavation at the site referenced below. the following summarizes our observations and opinions at the time of our visit. SECUINIV., CONSULTING ENGINEERS kp A CTL 1 THOMPSON COMPANY Client:.S'1t'Anevire4 12eso'd n Site Address: 63o S r.,, }'l, 54re" � Secure Job #: SFDI?63 - Fo.4 Co ll.s [,olo.ado Lot: — Block: --Filing: — Date: -15-06 Contact: colleen S njcy;cb Subdivision: Backeround Information: Soils Report by: 9 C 1 a 6)C 180q. 2 Date: h q _Job#: h /A Anticipated Soil Profile: f) Foundation Plan by: .SCC44re. Date: % Z4-06 Job#: 5 F01303 Anticipated foundation type? ❑ spread footing ❑ wall on grade ❑ footing with voids ❑ pad and grade beam ❑ drilled piers JO other (describe) Mo•+o s 1,. 6 Observed Soil Profile: s:iiy sI i(4 li9l,lll�} Dynamic Cone Penetrometer Results: 5, % 6 Notes:_ L oosr So 15 if, r. p 6 see,.24 l 0in +tit ,�� ,�4'&n to es rlr.>fti Of 7'•• y,. 71,e 4ap2ja'I itet< T not 6« 5 ).:o,�rol Le e.ls. itie S l4/ b G •.d /00 re SO. Ix "C i0 Oi i1_L.S �'Oi7 SOLI % �eqe/wi'» .D - 6" a ba.,e_ Ica de p' 12,(0„ 'j•SNG Summary of Opinions A It is our opinion that the exposed soils are generally consistent with those anticipated. ❑ It is our opinion that the exposed soils differ significantly from those anticipated. (2"d observation required) Recommendations: vec7ei4�' t'a. be�eG,I►, 5 ie Ia P lore :) MO�s •G Coftcjl /nn 61 Gi neromPGCI Q �l �Dofe SOt h GS ^ A e 4 Cie Pcc, e'I'[ By Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 • Ph: 970-47_ 6255 • � Fax:970-472-6256 Footing Oualitv Assurance Observation Per the clients request, a representative of SECURE has visually observed the footing forms under construction at the site referenced below. The following summarizes our observations and opinions at the time of our visit. SECUI%X... CONSULTING ENGINEERS A CTL I THOMPSON COMPANY Client: 54Ane✓•'c 4 JCeL;den ce Site Address: 6.30 Sr :iti 51,eel Fo. f 611'.4 LD10r1rde Secure Job #: SFO /303 Lot: — Block: —Filing: Date: -)5-06 Contact: Colleen SAneA,r Subdivision: Foundation Plan Information Plan By: S 2G.ule. Date:7-24-06 Job#: SF01303 Fig sizes: 1 2 Pad sizes : n /G Concrete on -site? ❑ yes , ® no, (+/- % ftg poured ) Are the footing forms free of loose material, frost, water and or ice, roots.. etc? ❑ yes , A no Are the Footing / Pad form sizes in general conformance to the above foundation plan? la yes , ❑ no Is the footing/pad reinforcing steel in -place or on site per the above foundation plan? ❑ yes, ❑ no Weather: Cka, WE Notes: Reba. no,-ti +I, e.,A fo„; r Na cQr�'. Vcrc_ 1 Summary of Opinions I,$ It is our opinion that the footing formwork is in general conformance with the foundation design referenced above. ❑ It is our opinion that the footing formwork differs significantly from the foundation design referenced above (2"d observation required). Corrective action: Tn s %^ 1 t s, fe.�o&,vi 24"x zy,, (o.ne- bars - Linp( aa.'.. 1a. n C. n, M 2y" SPI.cc Jen!j 11ir0.41,0./ Fied Representativer` Date 39 Secure Foundations, LLC 0 211 West Magnolia Street, Ft. Collins, CO 80521 0 Ph: 970-472-6255 • Fax: 970-472-6256