HomeMy WebLinkAbout648 HEATHER CT - SPECIAL INSPECTIONS - 7/29/2008Grown Zniineerin9, M. Strs4ctt4ra1.E"meertn9 * Imspectsons July 29, 2008 C H Hart Construction Co Inc 609 Cordial Rd Fort Collins, CO 80524 Re Footing Observation, 648 Heather Ct , Fort Collins, CO Crown Engineering, llc Project No 50-01-04-02a Gentlemen We have visually observed the footing sizes for the addition under construction at the residence at the above referenced location This observation was performed on July 29, 2008 It is our opinion that the footing sizes and widths were in general conformance with the foundation plan, drawn by Crown Engineering, llc , Job No 50-01-04-01, dated June 12, 2008 If you have any questions, please do not hesitate to contact me at (970) 691-4239 Sincerely, Grown 0 REC/ o, P E Structural TAL ECG\ Main Office 524 Stover Street Fort Collins Colorado 80524 Phone (970) 498 9537 Cell (970) 6914239 e mail reyessf5@msn com Grown ZK9imeri", 11c. * J�9 zz/ StrHctUrat Z"in"nn J 4 Inspectsons August 4, 2008 C H Hart Construction Co Inc 609 Cordial Rd Fort Collins, CO 80524 Re Girder Truss change -out, 648 Heather Court, Fort Collins, CO Crown Engineering, llc Project No 50-01-04-03a Gentlemen As requested, we have reviewed the feasibility of changing out the girder truss as called out on the foundation plan to a Microllam beam It is our opinion that a (3) 1-3/4" x 16" Microllam beam can be used in lieu of the girder truss The three-ply beam should be screwed together with (3) rows of 1/4" x 3-1/2" screws or lag screws at 12" on center If you have any questions, please do not hesitate to contact me at (970) 691-4239 Sincerely, Grown , Tnc ito. P E a S-10 L Main Office 524 Stover Street Fort Collins Colorado 80524 Phone (970) 498 9537 Cell (970) 691-4239 e mail reyessf5Ca msn com Grown Zniinezrini, M. Structrsrat Znjsneersn9 * Inspectsons 00Aoa012-- July 29, 2008 C H Hart Construction Co Inc 609 Cordial Rd Fort Collins, CO 80524 Re Excavation Observation for 648 Heather Ct , Fort Collins, CO Crown Engmeenng, llc Project No 50-01-04-02 Gentlemen On July 29, 2008, we visually observed the excavation at the above referenced location The purpose of this observation was to verify that the bearing capacity of the soil is adequate for the support of the foundation as shown on the foundation plan by Crown Engineering, llc, project number 50-01-04-01, dated June 12, 2008 At the time of our observation, the excavation had been completed The excavation revealed brown, slightly sandy lean clays to the depths excavated, which was to approximately frost depth level The subsurface conditions exposed in the excavation appears to be suitable for the placement of the foundation as designed by Crown Engineering, llc If you have any questions, please do not hesitate to contact me at (970) 691-4239 Sincerely, �0 RE Grown - � t AA �,PE Structural AI1AL Main Office 524 Stover Street Fort Collins Colorado 80524 Phone (970) 498 9537 Cell (970) 6914239 e mail reyessf5®msn com Grown Zniineerin9, M. Structure t Z"tneart" 1 Inspecttons July 31, 2008 C H Hart Construction Co Inc 609 Cordial Rd Fort Collins, CO 80524 Re Wall Steel Observation, 648 Heather Court, Fort Collins, CO Crown Engineering, llc Project No 50-01-04-03 Gentlemen We have visually observed the wall reinforcing placed in the forms for the addition under construction at the above referenced location This observation was performed on July 30, 2008 It is our opinion that the reinforcement was in general conformance with the foundation plan, drawn by Crown Engineering, llc , Job No 50-01-04-01 If you have any questions, please do not hesitate to contact me at (970) 691-4239 lnc. Main Office 524 Stover Street Fort Collins Colorado 80524 Phone (970) 498 9537 Cell (970) 691-4239 e mad reyesst5@msn com