Re Footing Observation, 648 Heather Ct , Fort Collins, CO
Crown Engineering, llc Project No 50-01-04-02a
Gentlemen
We have visually observed the footing sizes for the addition under construction at the residence at
the above referenced location This observation was performed on July 29, 2008
It is our opinion that the footing sizes and widths were in general conformance with the foundation
plan, drawn by Crown Engineering, llc , Job No 50-01-04-01, dated June 12, 2008
If you have any questions, please do not hesitate to contact me at (970) 691-4239
Sincerely,
Grown 0 REC/
o, P E
Structural TAL ECG\
Main Office
524 Stover Street
Fort Collins Colorado 80524
Phone (970) 498 9537
Cell (970) 6914239
e mail reyessf5@msn com
Grown ZK9imeri", 11c. * J�9 zz/
StrHctUrat Z"in"nn J 4 Inspectsons
August 4, 2008
C H Hart Construction Co Inc
609 Cordial Rd
Fort Collins, CO 80524
Re Girder Truss change -out, 648 Heather Court, Fort Collins, CO
Crown Engineering, llc Project No 50-01-04-03a
Gentlemen
As requested, we have reviewed the feasibility of changing out the girder truss as called out on the
foundation plan to a Microllam beam It is our opinion that a (3) 1-3/4" x 16" Microllam beam can
be used in lieu of the girder truss The three-ply beam should be screwed together with (3) rows of
1/4" x 3-1/2" screws or lag screws at 12" on center
If you have any questions, please do not hesitate to contact me at (970) 691-4239
Sincerely,
Grown , Tnc
ito. P E a
S-10 L
Main Office
524 Stover Street
Fort Collins Colorado 80524
Phone (970) 498 9537
Cell (970) 691-4239
e mail reyessf5Ca msn com
Grown Zniinezrini, M.
Structrsrat Znjsneersn9 * Inspectsons
00Aoa012--
July 29, 2008
C H Hart Construction Co Inc
609 Cordial Rd
Fort Collins, CO 80524
Re Excavation Observation for 648 Heather Ct , Fort Collins, CO
Crown Engmeenng, llc Project No 50-01-04-02
Gentlemen
On July 29, 2008, we visually observed the excavation at the above referenced location The
purpose of this observation was to verify that the bearing capacity of the soil is adequate for the
support of the foundation as shown on the foundation plan by Crown Engineering, llc, project
number 50-01-04-01, dated June 12, 2008
At the time of our observation, the excavation had been completed The excavation revealed
brown, slightly sandy lean clays to the depths excavated, which was to approximately frost depth
level
The subsurface conditions exposed in the excavation appears to be suitable for the placement of
the foundation as designed by Crown Engineering, llc
If you have any questions, please do not hesitate to contact me at (970) 691-4239
Sincerely, �0 RE
Grown -
� t AA
�,PE
Structural AI1AL
Main Office
524 Stover Street
Fort Collins Colorado 80524
Phone (970) 498 9537
Cell (970) 6914239
e mail reyessf5®msn com
Grown Zniineerin9, M.
Structure t Z"tneart" 1 Inspecttons
July 31, 2008
C H Hart Construction Co Inc
609 Cordial Rd
Fort Collins, CO 80524
Re Wall Steel Observation, 648 Heather Court, Fort Collins, CO
Crown Engineering, llc Project No 50-01-04-03
Gentlemen
We have visually observed the wall reinforcing placed in the forms for the addition under
construction at the above referenced location This observation was performed on July 30, 2008
It is our opinion that the reinforcement was in general conformance with the foundation plan, drawn
by Crown Engineering, llc , Job No 50-01-04-01
If you have any questions, please do not hesitate to contact me at (970) 691-4239