Loading...
HomeMy WebLinkAbout925 ARBOR AVE - SPECIAL INSPECTIONS - 7/25/2008i, STEIG E AND ASSOCIATES, INC. CONSULTING ENGINEERS P.O. Box 3666 7-25-2008 Estes Park, CO 80517 970-577-1070 Drennen Custom Contracting (Phone & Fax) P.O. Box 272167 Ft. Collins, CO 80527 Re: Home Remodel at 925 Arbor Ave. / Beam Check and Resizing in the Sun Room area. S & A Project No. 0821 Dear Sir The undersigned made an on site visit to the house on July 23, 2008 and viewed the extent of the affected area and support beam requirements at that time. We determined that one approach to solving the support problem would be to remove the existing beam (which spans one half the required distance) with one that would span the nominal distance of 24 feet, from bearing wall to the outside bearing wall. The actual loading is not great and an analysis has determined that a double 11- 7/8 microllam would be adequate for the span loading. Solid stud under the beam and provide 3-1/2 inch bearing at each end. Field frame the required roof rafters and ceiling elements to match into the existing, adjacent room. The existing perimeter foundation wall and footings are adequate for the small load increments added by the revised wall framing and beam loading. Hurricane clip the roof rafters to the microllam. Yours truly, Steige and Associates, Inc. e, e- B0804761 Electrical Systems, Foundation and Structure Design & Construction Management