Loading...
HomeMy WebLinkAbout648 S COLLEGE AVE - SPECIAL INSPECTIONS - 1/11/2007LAWSTRUCTURAL ENGINEERS Date: January 11, 2007 Client: Mr. Robert Lollar Advanced Construction and Consulting P.O. Box 944 Lancaster, South Carolina 29721 Subject: Framing Observation 648 South College Avenue, Fort Collins, Colorado Project No. SF01322 Mr. Lollar, We conducted several site visits to the above referenced site. These site visits were conducted to observe the new and modified framing for the Noodles and Company remodel. We used the original construction documents along with several plan revisions and additional detail sheets to conduct these observations. We observed the second floor framing from the main floor. The second floor patio framing was observed on a limited basis through the removal of several decking boards. The second floor wall system was observed after the steel framing had been installed and following the sheathing installation. Based on our observations the observed framing was installed and completed in substantial compliance with the plans, details, and emails prepared by Monroe & Newell. This report is based upon our site observations, a review of the documents provided, and our experience with projects of this type. Our observations were limited by the presence of backfill, wall and ceiling coverings, and other finishes. Unseen defects may exist which could affect the performance of the structure. Therefore, no warranty regarding future performance of the structure is expressed or implied. Very truly yours, CTLITHOMPSON roject Engineer (3 copies sent) 38108 Z �S`S�ON41 •�� EERS FORT COLLINS, LLC CTL I Thompson Structural Engineers Ft. Collins, LLC (Formerly Secure Foundations, LLC) 351 Linden Street ( Suite 140 1 Fort Collins, Colorado 80524 1 Telephone: 970-206-9455 1 Fax: 970-206-9441 4q� le�o'�010z'lv Date: January 11, 2007 Client: Mr. Robert Lollar Advanced Construction and Consulting P.O. Box 944 Lancaster, South Carolina 29721 NinaSTRUCTURAL ENGINEERS Subject: Framing Observation 648 South College Avenue, Fort Collins, Colorado Project No. SF01322 Mr. Lollar, We conducted several site visits to the above referenced site. These site visits were conducted to observe the new and modified framing forthe Noodles and Company remodel. We used the original construction documents along with several plan revisions and additional detail sheets to conduct these observations. We observed the second floor framing from the main floor. The second floor patio framing was observed on a limited basis through the removal of several decking boards. The second floor wall system was observed after the steel framing had been installed and following the sheathing installation. Based on our observations the observed framing was installed and completed in substantial compliance with the plans, details, and emails prepared by Monroe & Newell. This report is based upon our site observations, a review of the documents provided, and our experience with projects of this type. Our observations were limited by the presence of backfill, wall and ceiling coverings, and other finishes. Unseen defects may exist which could affect the performance of the structure. Therefore, no warranty regarding future performance of the structure is expressed or implied. Very truly yours, CTLITHOMPSON M.zKnutson, (3 copies sent) „F�PDD.L•��'c�A �'.�. UCTURAL_'�ENGII ,FOR �P o.. c, 38108 z. �SS/ONAL ERS FORT COLLINS, LLC CTL I Thompson Structural Engineers Ft. Collins, LLC (Formerly Secure Foundations, LLC) 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 1 Telephone: 970-206-9455 1 Fax: 970-206-9441