Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - SPECIAL INSPECTIONS - 10/24/2006A L October 24, 2006 / /� / 1 rerracon f] /„ / / / � � Consulting Engineers 8, Scientists �/ (� V `�7 301 North Howes Mr. Scott McIntosh r Fort Collins, Colorado 80521 Murphy Company Phone 970.484.0369 3790 Wheeling Street j f 60 Fax 970.484.0454 Denver, CO 80239 (� www.tercacon.com Re: Avargo Building 1 Mechanical Addition 3400 East Harmony Road Fort Collins, Colorado Project No. 20061105 We are transmitting: ® Field Data Regarding: ❑ Compacted Fills ❑ Footings ❑ Concrete ❑ Asphalt ❑ Aggregate ® Non -Destructive Testing of Steel ❑ Permeability Test ® herewith ❑ under separate cover ❑ Laboratory Data ❑ Report ❑ Revised Report ❑ Location Diagram ❑ Soil Samples ❑ Construction Material Samples ❑ Moisture -Density ❑ Grain Size Analysis ❑ Masonry ❑ R-Value ❑ General Information ❑ Certifications ❑ Resumes ❑ Other ❑ Report will follow under separate cover On -site observation services were provided ❑ Full Time ❑ Part Time ® Not Applicable We have not been asked to interpret the data or to make design and/or construction recommendations based on the data, and cannot assume responsibility or liability for interpretation of this data by others. Remarks Reports attached dated 10/2/ and 10/9/06 — dispatches .0001 and .0002 Sincerely, TERRACON l/ C�v/Z� Mike L. alker, CET Manager of Construction Services Enc/Copies to: (2) Addressee Delivering Success for Clients and Employees Since 1965 More Than 80 Offices Nationwide icesEE3Xd+. va Red Tail Way vans, CO 80620 Bus: 303-941-9272 Project Name: Avago Technologies Client Name: Terracon Inc. Contractor: Tiger Steel Date: 10/2/06 Page I of 1 Inspex J/N: 26120 Client J/N: 20061105 Description of Work: VT of structural steel erection. Persons Notified of Results: M. Walker/Terracon; T. French/Tiger Observations: Per the request of T. French of Tiger Steel, visual observation of the erection of structural steel was performed at the Roof level at lines T.5-V, 3-5. Beam reinforcing at new cooling tower location was observed with the following conditions noted: Rods have been placed at beam bottom flanges; cover plates are detailed. Rod welding was noted as approximately 90% complete this date with weld quality noted as acceptable in completed areas. Today: 0; 30 mi. Larry D.thoriono boraa XN C�i� ln sp3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Avago Technologies Client Name: Terracon Inc. Contractor: Tiger Steel Date: 10/9/06 Page 1 of 1 Inspex J/N: 26120 Client J/N: 20061105 Description of Work: VT of structural steel erection. Persons Notified of Results: M. Walker/Terracon; T. French/Tiger Observations: Per the request of T. French of Tiger Steel, visual observation of the erection of structural steel was performed at the Roof level at lines T.5-V, 3-5. Beam reinforcing at new cooling tower location was observed with work noted as substantially complete per plan specifications in observed areas. 30 mi. �Latry p,'thorblorn3on \$CW�//