Re: Avargo Building 1 Mechanical Addition
3400 East Harmony Road
Fort Collins, Colorado
Project No. 20061105
We are transmitting:
® Field Data
Regarding:
❑
Compacted Fills
❑
Footings
❑
Concrete
❑
Asphalt
❑
Aggregate
®
Non -Destructive
Testing of Steel
❑
Permeability Test
® herewith
❑ under separate cover
❑ Laboratory Data ❑ Report ❑ Revised Report
❑
Location Diagram
❑
Soil Samples
❑
Construction Material
Samples
❑
Moisture -Density
❑
Grain Size Analysis
❑
Masonry
❑
R-Value
❑ General Information
❑ Certifications
❑ Resumes
❑ Other
❑ Report will follow under
separate cover
On -site observation services were provided ❑ Full Time ❑ Part Time ® Not Applicable
We have not been asked to interpret the data or to make design and/or construction
recommendations based on the data, and cannot assume responsibility or liability for interpretation of
this data by others.
Remarks Reports attached dated 10/2/ and 10/9/06 — dispatches .0001 and .0002
Sincerely,
TERRACON l/
C�v/Z�
Mike L. alker, CET
Manager of Construction Services
Enc/Copies to: (2) Addressee
Delivering Success for Clients and Employees Since 1965
More Than 80 Offices Nationwide
icesEE3Xd+.
va Red Tail Way
vans, CO 80620
Bus: 303-941-9272
Project Name: Avago Technologies
Client Name: Terracon Inc.
Contractor: Tiger Steel
Date: 10/2/06
Page I of 1
Inspex J/N: 26120
Client J/N: 20061105
Description of Work: VT of structural steel erection.
Persons Notified of Results: M. Walker/Terracon; T. French/Tiger
Observations: Per the request of T. French of Tiger Steel, visual observation of the erection of
structural steel was performed at the Roof level at lines T.5-V, 3-5. Beam reinforcing at new cooling
tower location was observed with the following conditions noted:
Rods have been placed at beam bottom flanges; cover plates are detailed.
Rod welding was noted as approximately 90% complete this date with weld quality noted as
acceptable in completed areas.
Today: 0; 30 mi. Larry D.thoriono boraa
XN
C�i�
ln sp3311 Red Tail Way
Evans, CO 80620
Bus: 303-941-9272
Project Name: Avago Technologies
Client Name: Terracon Inc.
Contractor: Tiger Steel
Date: 10/9/06
Page 1 of 1
Inspex J/N: 26120
Client J/N: 20061105
Description of Work: VT of structural steel erection.
Persons Notified of Results: M. Walker/Terracon; T. French/Tiger
Observations: Per the request of T. French of Tiger Steel, visual observation of the erection of
structural steel was performed at the Roof level at lines T.5-V, 3-5. Beam reinforcing at new cooling
tower location was observed with work noted as substantially complete per plan specifications in
observed areas.