Loading...
HomeMy WebLinkAbout4700 INNOVATION DR - SPECIAL INSPECTIONS - 4/28/199505-03-1995 17:21 3032241552 vAUGHT FRYE ARCHITECTS P.02 4•'"(pp Innoya-Eioy1 1���� �3 RECEIVED MAY 0 3 1995 28 April 1995 Mr. Gary Dennison Vaught Frye Architects 1119 Stoney Hill Drive Ft. Collins, Colorado 80525 Res INNOVATION DRIVE OFFICE BUILDINGSI Lot 1: Ross Building, lob No. 2439.1 Lot 21 Corcoran/Nyoo Building, lob No. 2439.2 Lot 31 Drahota Office Building, Job No. 2489.0 Dear Mr. Dennison: In response to your questions concerning the structural design of the three buildings referenced above with regard to inspections, we note the following) 1. WELDING: Spooial moment —resisting steel frames were not need in the design. Fillet welds to be made in the field during construction were assigned to be stressed to 50% or lose of the allowable stresses. Therefore, we believe inspection of such welding, as well as the roof dock welding, can be done on a periodic basis per code ■action 306(s)S.B.Exception 2. 2. HIGH —STRENGTH BOLTING: These buildings were designed for shear/ bearing —type connections with threads not excluded from Shear planes. Therefore, we believe that initial inspection of the bolts and final observation of the installation will comply with code section 306(a)6. under the Exception. 3. STRUCTURAL MASONRY! Stresses used in the design of the StruO— tural masonry for these buildings have been adjusted to permit non —continuous inspection, that is they have been reduced by one half per Section 2409.(0)1. please call if you have questions concerning the above. Very truly yours, CONSULTANTS, INC. ek '' , A h --Ao�w AN it 1Mark A. Miller, F.E. 17808 � MAM/ 00 „ti..Nce' rnrin1d Il. • 11RPO sv. nierllcdo • Inlen� rnnr( rnln, Gt???R •'�0'1 •9rtri