Loading...
HomeMy WebLinkAbout4700 INNOVATION DR - CORRESPONDENCE - 3/9/19981dA:{{-12-96 TnU iU 55 AM DATH H—Hi;r;i rA11 i10. 91u 404 i Y 2000 E. Prosoec S'- Ft. Collins. CO 80525 (970) 484.5022 FAY. 1970) 484-3718 March 9, 1998 Delta Construction Cc Fort Collins, CO 80521 Attn Kurt RE: Merit Flecti is Oai.ridgc Business Park, 17th Filing Dear Kurt, We are pleased to quote the landscape and irrigation installation per the above referenced project as follows landscape including soil prep in all turf areas at 3 C%y organics per 1000 square feet, plantings. steel header, weed barrier, bluegrass sod, dryland seeding, and pole peel wood mulch Subtotal S. 903?.00 IrriL,atign based on a 3/4" tap, shutoff, and drain stubbed by Delta on the north side of the building. All turf areas watered with pop-up sprays and all shrub beds and plantings in dryland turf areas watered with drip irrigation. Power to the controller (by Delta) located near the tap. Sleeves are included prior to any curb, walk, or form installation. Subtotal 5 2915.00 { TntA landscane and irri¢ation 5 11952.00 11 This quote includes a 3.655'0' state and county sales tax, irrigation submittal to the City Utility Services and permit. The grade is bascd on +/- .I foot final grade prior to installation by Rath Dryland seeding is included south of the south walk and around the outside perimeter to the turn around on the north sick The additional patio is included. Add alternate #1 install fiber fir wood mulch in lieu of pole peel mulch Add 5 300.00 Add alternate 92- Install steel header and wood mulch around the groundcover and shrubs in the south side dryland seeded area Add $ 595 00 Please contact me with any questions you may have. I look forward to hearing from you soon Thank you, / Pocr-It• Fax Note 7671 / L From COIDVpt co Kevin Leman Pn� r Phon¢ 13AT[ CV4C. F[.c ..,n+P7-7A Fw.d