Loading...
HomeMy WebLinkAbout4700 INNOVATION DR - SPECIAL INSPECTIONS - 9/9/199811-OS-1998 12:10PM FROM P.2 °EC�tVcC SAP 1 2 19ge FRONT RANGE STEEL coo 7�, P.O. Box 630 LF g-'loo 1KA01 &+iDK DA,0, 3620 E. Cry. Rd. 82 Wellington, CO 80549 970-568-9002 • FAX 970+568-9004. September 9, 1998 Mr. Kurt Sommermeyer Oetta Construction 308 South Howes Street Fort Collins, Colorado 80521 Re: Merit Electric, Building. Permit #980 814 Dear Kunz. This letter affirms that the undersigned was the Structural Engineer of Record for the above referenced building. and periodically. visited the site during the structural portion of construction to observe the quality and progress of the structural portions of the work and to determine whether that portion of the work was in general conformance to the structural portion of the Contract Documents. Our observations were mader to protectthe public and the owner and were not responsible for the contractor's work or work methods, safety on or near the site, timeliness of the work, nor any other aspect. of the construction for which the contractor was responsible. Our office made site visits at the times when we could view the foundation work, the bearing wail construction and the roof framing. Our scheduled observations are complete. It is our opinion that the completed structural portion of the construction is in general conformance with the structural portion of the contract documents. If you have questions concerning this matter please call. Sincerely, word ,2 S %rre, H. Gary H ell, P.E. OS-1998 12:10PM FROM P_3 1 'EEC EARTH ENGINEERING CONSULTANTS, INc. June 20, 1998 Delta Construction, Inc. 308 South Bowes Fort Collins, Colorado 80521 Attn: Mr. Kurt Sommermeyer Re: Construction Observation and Testing 4700 Innovation Drive Fort Collins, Colorado EEC Project No. 1984020 Mr. Sommermeyer: As requested, during the period April 1 through April 30,1998. Earth Engineering Consultants. Inc. (EEC) personnel provided construction observation and testing services to you for the referenced project. Those services were provided on a part-time, on -call basis and included observation and testing of backfill placed adjacent to the foundation walls. Field density tests were completed by EEC personnel at random locations within the completed pad area. Results of those tests are shown on the attached summary sheet. Those test results met the project compaction criteria of at least 951/6 of standard Proctor maximum dry density at 4% of standard Proctor optimum moisture content. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth.)Engineering Consultants, Inc. Lester L. 1L't4'od, P.E. Principal Engineer CENTRE FOR ADVANCED TECHNOLOGY 2301 RESEARCH BOULEVARD. SUITE I Od FORT COLuNs. COLORADO 60528 (970) 224.1 522 (FAX) 224-456a SUMMARY OF FIELD DENSITY TEST RESULTS ROJECT: Delta Cons1rudIon Foundation Wall Dackfili Project No. 1984020 Technician: DDT Date: MarchlA ril 1998 Gauge: 344094 eat Date Approxinmte Locallon/Notes Ekv./ Proctor Wet % Dry % of Required PMSI .Fail Moist Dan.. 6 3131 (merior W Wall20'N -1.0 A 124.4 15.6 107.E 96 f2% 95% P 7 3/31 Interior W Wall 30% -0.0 A 121.5 13.2 107.3 96 t2% 95% P 8 3/31 Interior W Wall 20'S -1.0 A 123.4 13.7 108.5 97, 2% 95% 0 9 3/31 Interior N Well S'W -010 A 122.5 14.9 106.6 95 t2% 95% P 10 3/3) Interior N Wall YE -1.0 A 121.5 13.7 106.8 95 *2% 95% P 1 4/1 InteriorS Wall 10'W -0.5 A 124.2 15A 107.6 96 t2% 95% P .2 4/1 InteriorS Wall25'W -0.5 A 124.9 14.7 108.9 97 t2% 95% P .3 411 Interior E Wall 10'S -1.0 A 123.1 13.9 108A 97 #2% 95% P .4 411 Interior E Wall 20'S -0.0 A 125.6 14.7 109.5 98 t2% 95% P 5 4/1 hueriorNWall 20'W -0.0 A 124.3 15.2 107.9 96 f2% 95% P 6 4l7 interior Main 0+10'(W) -1.0 A 123.1 IC7 107.3 96 #2% 95% p 17 4/7 imeriorMain 0+15(W) -0.0 A 122.8 15.2 106.6 95 #2% 95% P 18 4/7 Interior Main 0+20(S) -1.5 A 123.0 14.9 107.1 96 #2% 95% Proctor Designation A Maximum MY Densilz 112.0 O limum Moisture Content 15.0 EEC