HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 1/30/2001Date: 30 — 0
Pro'ect .4 Q i' a N � ^/
rD P�'n
S
Piping System Tested -
System Location
Dates Test Perfol.,
(A)
Project No. "2 it)
Job Foreman 41 4,, c
Started At Ll v A.M. P.M. ( ) Oy�3 /y/F
(B) Completed At A.M. ( ) P.M. ( )
Pressure Test Performed At !V Pressure Loss _
Testing Method
Remarks
Signed By
Natkin Contracting Foreman
•v
Accepted By: Resident Engineer, El , fL7 OGG.VD
This �� _Day of ,-T,^-----
City Inspector, / �r /ham i '��^ D
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS
TEST DATA
DATE SCALE
Nn ContrWN
340 t0*4F
FILE No. DRAWN BY CHECKED BY SHEET
N• 179