HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 1/23/2001 (2)Bate: l—,I3 -o l i 3io�
� Project No.
� I t
iect ail gut/d ZAQ 6t Job Foreman '
b
q�* ping,*Iem Tested i 4
.Sv�a//I will
�- r
` ,Lgtotiori a�ro 4J .C/ mod'
I Performed:
(� Started /-, .3 -O 1 At f>_ : A.M. t ✓� P.M. ( ) t
-i At�LtL_ : 3 Q A.M. P.M.
-�: (�j Completed o � ( ) ( )
",
Un Test Performed At ir Pressure Loss
%-Method
Natkin Contracting Foreman
By: Resident Engineer,
This �,. � Day of ,
City Inspector,
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTMIG AND`
FORBIDDEN EXCEPT WITH WRITTEN CONSENT.
TEST DATA
/� // �Id/A • DATE SC
• �3 �v �%�j /�j�7"' J NOR Contre"
FILE No. DRAWN BY CHECKED BY ^SI