Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 1/23/2001Date: 1* � ..Pi i 4Z,s#.M T.,4..4 %%'rpm / -t gg p J CJ- 1/0 J I I otem, LocationSe-ruic-e, 4eve-1 Serla& /a/ 2- ,t 7 otei�w Performed: (A) Started 1-2 3 At. Q A.M. P.M. (B) Conipleted. 1-2 3-0 At /0 A.M. P.M. essure Test Performed At Pressure Loss Project No. 3162 -7 0 Job Foreman —,o9J,4//e-,,/t/e �SA 91 4 ne'JXB Natkin Contracting Foreman opted By: Resident Engineer, Jan 1002 City Inspector, This —4zr—cll Day of 129 1:1'� THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL FORBIDDEN EXCEPT WITH WRITTEN CONSENT. TEST DATA c4 DATE SCAW -.A — — — ALE Nallin DIM" '[N-179 FILE No. DRAWN BY CHECKED PY