Loading...
HomeMy WebLinkAbout1418 HIWAN CT - MISCELLANEOUS - 12/7/2000441, Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 City of Fort Collins INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION HIRED BY la G CM411TA , 12X*W01 l CITY 4- 7- - C412(-4-/Al STATE PHONE CQRMC # E s • JI3JI���l��7.' • fil"S�FYl��r'L'C�� Codes: Pass = ✓ Fail = O Not applicable =NA / INSPECTION #1 TYPE OF FOUNDATION "awl space V basement _slab on grade TYPE OF SYSTEM BEING INSTALLED Passive sub -membrane system ctive sub -membrane system Passive system - sub slab Active system - sub slab _combined radon system CONjP6NENTS - sub slab/ basement V/ _4 inches aggregate or perforated pipe or collection mat _diffusion retarder (not required ere sealing has occurred) e fitting v perforated vent pipes (min. 10 ft.) INSPECTIONS #2 and #3 SYSTEM APPROVED: ' YES NO DATE 1Z _ _0� COAp ONENTS Se ling of openings, penetrations, /' ints ��//���/// erforated floor vent pipe 4" PVC radon vent pipe _dill ion retarder membrane embrane sealed to wall & fixtures PVC pipe sealed at all penetrations & onnections inawall sleeves installed ystem labeled inside and outside Sy m accessible for repair or stallation of fan electrical connections for fan termination ation of system meets standard corrosion resistant screen at end of discharge pipe (% to Y2 openings) )1 Rfan properly installed outside living space N AManometer or other US EPA approved monitoring device installed Make-up air vents Comments CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my knowledge and professional ability, 1 have inspected the above -described radon mitigation system and have found it to be installed in accordance with the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other pens s m connection with the installation, operation, or maintenance of such radon mitigation system,/ SIGNATURE OF INSPECTOR _ DATE 1Z _ 7 _6'0 White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources