Loading...
HomeMy WebLinkAbout947 WORTHINGTON CIR - SPECIAL INSPECTIONS - 9/8/19939G4't Wari�n� w�1a� C� vrte. TAL INC SIMPSON SHEET ME 126 Hemlock P. O. Box 271 Fort Collins, CO 80522 (303) 482-2775 FAX (303) 482-0550 ' � � �"' Metro 623-8362 S E P 0 8 1993 By LOBAR, INC. DATE: September 8, 1993 TO: Lobar, Inc. P. O. Box 1987 Fort Collins, CO 80522 Attn: Lloyd Jenkins Fax: 493-7614 RE: Columbine Services Project Model Energy Code Compliance Calcs 397 SF Foundation wall at basement U = .68 5083 SF Net roof with R39 insulation 636 SF Exterior glazing U = .55 2279 SF Exterior wall with R19 insulation 2470 SF Floor over venter crawl space R13 insulation Uo wall: (636�x 551 + (2279 x 051 + (397 x .68) = .234 3123 Uo roof: (5083 x 03) + (60 x .551 = .036 5143 Exterior wall Uo required = .27✓ Actual = .24 Roof Uo required = .08 ✓ Actual = .04 Floor over crawl Uo required = .08 Actual = .07 Based on these calculations this project meets the requirements of the 1986 model energy code as it relates to the thermal envelope and mechanical systems provisions of the code. Tom� Wasmer, Estimator