Loading...
HomeMy WebLinkAbout924 RICHMOND DR - CO/LOC - 6/24/19909C0-G02,� °n9 Insp Pmk -Contract,, City of Fort Collins - Y°"^e` Green -Uhlilies Temporary Certificate of Occupancy Green This is to certify that the building, structure, or land located at 2� r��l^� Ln_10 nr I Fort Collins, Colorado has been inspected and temporary Occupancy of the same is hereby authorized, conditional upon the following requirements being completed and approved upon final inspection w+th m — -' -ql - tae date of issuance of this certificate by the Buildin Inspection Office. g Building Code requirements: 1. a 3. 4. Zoning Requirements: 2. 3. 4. Other Requirements: 1. 2. 6c Cron 6L� If such work is not completed within the time set forth above and approved on final inspection, or unless the time for completion is extended by the Building Inspection Office, an order to vacate the premises, or a violation notice for occupying- the- building, structure, or land without a CertificatL-of Occupancy will be issued. Such a violation is subject to amaximum fine of P0o and/or 90 days in jail for every day of violation. OWNER ORAESSEE AUTHORIZED BY UAIE DATE 6 - d4-y() DATE OF ISSUANCE NOTE: The issuance of this temporary occupancy permit will entitle the owner to place City Utility service in the owner's name. Construction power rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities into the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. l n- Rnk-ContoMracctorlw City of Fort Collins Pi Veen Temporary Certificate of Occupancy Green-Uhltlies This is to certify that the building, structure, or land located at -I ? T f��� �h � )% j �1 Dr C_ Fort Collins, Colorado has been inspected and temporary occupancy of the same is hereby authorized, conditional upon the following requirements being completed and approved upon final inspection within — ` —9�c do" -from the date of issuance of this certificate by the Building Inspection Office. Building Code requirements: 2. 3. 4. Zoning Requirements: ,. Hold CC, -*o.,- ICAZ, 2. 3. 4. Other Requirements: 1. PA it7s�cHar) I� �d ��J ct- 1 1 i of cvec];, — If such work is not completed within the time set forth above and approved on final inspection, or unless the time for completion is extended by the Building Inspection Office, an order to vacate the premises, or a violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such a violation is subject to a maximum fine of $300 and/or 90 days in jail for every day of violation. OWNER OR SSEE 4 AUTHORIZED BY DATE DATE Lca 4 DATE OF ISSUANCE NOTE: The issuance of this temporary occupancy permit will entitle the owner to place City Utility service in the owner's name. Construction power rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities into the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills.