Loading...
HomeMy WebLinkAbout919 SHORE PINE CT - CORRESPONDENCE - 12/23/1998December 23, 1998 Jeffries Custom Construction 1609 Wagon Tongue Court Fort Collins, Colorado 80521 RE: Nelson Residence Addition 919 Shore Pine Court Fort Collins, Colorado Project No. 20986109 Gentlemen: Irerracon 301 N. Howes PO. Box 503 Fort Collins, Colorado 80521-0503 (970)484-0359 Fax (970) 484-0454 As requested we have reviewed the following framing item at the referenced project. • The mono trusses at the garage are supported at the second floor by hanging the trusses to a 2x12 which is suspended from the second floor framing with 7/16" OSB extending 8 feet vertically. Based on the imposed loads it is our opinion the OSB and 2x12 ledger is adequate to support the ends of the mono trusses. The OSB should be nailed to the 2x12 with (3)-8d nails at 3" on center or (12)-8d nails per foot. If you have any questions, please contact us. SiKlrely, TERROMON "+F•Si//°'' 01 f (�a G. Weeks; P • 2v 3� Cl- • ci St ctural Engi7 ,(. •; ;�, s UM /sllll I1 i 1111t�0�\\\\`\ .Arizona -M Arkansas-WColorado.•1Idaho-Il!Vinois-W!owa-WKansas-WNflnnesota-!WKssouri-IlMontana- Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Quality Engineering Since 1965