HomeMy WebLinkAbout919 SHORE PINE CT - PERMITS - 12/23/1998December 23, 1998
Jeffries Custom Construction
1609 Wagon Tongue Court
Fort Collins, Colorado 80521
RE: Nelson Residence Addition
919 Shore Pine Court
Fort Collins, Colorado
Project No. 20986109
Gentlemen:
Irerracon
301 N. Howes P.O. Box 503
Fort Collins. Colorado 80521-0503
(970)484-0359 Fax (970)484-0454
As requested we have reviewed the following framing item at the referenced project.
• The mono trusses at the garage are supported at the second floor by hanging the
trusses to a 2x12 which is suspended from the second floor framing with 7/16" OSB
extending 8 feet vertically. Based on the imposed loads it is our opinion the OSB and
2x12 ledger is adequate to support the ends of the mono trusses. The OSB should
be nailed to the 2x12 with (3)-8d nails at 3" on center or (12)-8d nails per foot.
If you have any questions, please contact us.
Si cgrel , ���`� P�0 REGII
TMR7 ON.•.....,,STD
23012 . a
y G. Weeks, PE
S uctural Engineer,,`f
Fq� ••.....• ACi
..I�pkJ4_,
Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana
Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming
Quality Engineering Since 1965