Loading...
HomeMy WebLinkAbout908 PINNACLE PL - CORRESPONDENCE - 12/23/1996FOUNDATION �I AND SOILS Engineering, Inc. December 23, 1996 ' Commission No.: 2159-07-01-03 M. Brown Builders 2817 Double Tree Drive i Fort Collins, Colorado 80521�� Gentlemen: We have observed the drilling of several of the ten (10) inch diameter, straight shaft piers supporting the residence under construction at Lot 5, The Ramparts at Miramont (908 Pinnacle Place), a subdivision of Fort Collins, Colorado. This inspection was performed on December 23, 1996. Exposed soils measured from original grade consist of two (2) feet of silty clay over a silty claystone bedrock which extends tot he depths drilled, approximately twelve (12) feet. All piers observed were plumb, properly cleaned and of adequate length as specified on our foundation plan, Job No. 2159-07-01-01. Water was encountered during drilling. Therefore, we recommend concrete be placed immediately after drilling of each individual caisson. Casing was not required. If you have any questions, please feel free to call. Re in9A41Pat person, P.E.NDATION &4<�OILS ENGINEERING, INC. 5110 Granite Street . Loveland, Colorado 80538 . (970) 663-0138 . Fax (970) 663-1660 515 Main Street, Suite C . Longmont, Colorado 80501 . (303) 702-0661