HomeMy WebLinkAbout825 SMITH ST - INSPECTION RESULTS - 12/11/1999FIELD VERIFICATION FOR:
JOB ADDRESS
BUILDING PERMITS & INSPECTIONS
281 N. College Avenue
P.O. Box 580
Fort Collins, CO 80522
(970) 221-6760
;�GASPIPE
❑ MECHANICAL REPLACEMENT
DATE
INSTALLER'S NAME '
COMPANY NAMEH)qQ.) LICENSE #
(A) I verify that I have installed /_ (ft. approx.) of gas pipe, tested at %o
pounds for minutes, the resulAof which com with 10
pounds for 15 minutes minimum.
(A & B) I verify that I have installed mechanical equipment liste
in compliance with current city codes.
A — Permits required
B — Permits and inspections required