Loading...
HomeMy WebLinkAbout6908 ANTIGUA PL - SPECIAL INSPECTIONS - 1/14/2000PLAZA- ENGINEER'S FIELD REPORT Report Date: January-14i, 2000- �-J ��G Report No.: I Project: James Company Stanton Creek P.U.D., Filing 2, Phase I Location: 6908 Antigua Place, Fort Collins, Colorado Architect: Knudson Gloss Architects and Planners, Boulder, Colorado Contactor: James Company, Boulder, Colorado (Wes Huilmes) Subject: Concrete Wall Footings Date: January 14, 2000 (11:30 am) Weather: Sunny OBSERVATIONS In general, the concrete forms were properly set and free of debris. The reinforcing steel required for the pads was located adjacent to the forms, ready for placement. Vertical dowels consisting of No. 4 Grade 60 reinforcing steel was also ready for placement. The width of the wall footings and the size of the pads appeared to be consistent with the requirements of the foundation plan prepared by this office. FIELD INSTRUCTIONS GIVEN Instructed the concrete foreman to provide continuous footings between the crawl space and basement levels. PLAZA ENGINEERING CONSULTANTS, INC. PIG-BOX1001 Loveland, CO- 80539 -1002 (97,0)-663-63-53 (970)-56T-03S$Fax