Loading...
HomeMy WebLinkAbout6908 ANTIGUA PL - SPECIAL INSPECTIONS - 1/19/2000LMb A • 11 all ENGINEER'S FIELD REPORT Report Date: January 19, 2000 Report No.: 2 Project: James Company Stanton Creek P.U.D., Filing 2, Phase I Location: 6908 Aatiuua Place,.Fort Collins, Colorado Architect: Knudson Gloss Architects and Planners, Boulder, Colorado Contactor: James Company, Boulder, Colorado (Wes Huffnes) Subject: Concrete Foundation Walls Date: January 19, 2000 (11:30 am) Weather: Seasonal OBSERVATIONS In general, the size, type and placement of the reinforcing steel are consistent with the structural requirements outlined in the foundation plan prepared by this office. The horizontal reinforcement consists of No. 5, Grade 40 steel, while the vertical reinforcement was No. 4, Grade 60 reinforcing bar. All observed steel reinforcement was tied together properly, with laps at splices and corner bars being 24 inches minimum in length. FIELD INSTRUCTIONS GIVEN None. (Ream pockets were not in place at the time of these observations) PLAZA ENGINEERING CONSULTANTS, INC. P.O. Box 1002 Loveland, CO 80539-1002 (970)-663-6353 (970) 663-0368 Fax