Loading...
HomeMy WebLinkAbout627 STONEHAM CT - CORRESPONDENCE - 10/5/1999e� YDI-'3 October 5, 1999 Melody Homes 11031 Sheridan Boulevard Westminster. Colorado 80020 Attn: Mr. Shawn Weiman Re: Lot 56, Ridgewood Hills, Second Filing &2' Stoneham -Court Fort Collins, Colorado Project No. 20985076 Gentlemen: Irerracon 301N. Howes P.O. Box 503 Fort Collins. Colorado 80521-0503 (97(3)484-0359 Fax.(97D1484-0454 On October 1 and 5, 1999, Terracon observed foundation construction at the referenced site. Observations made on October 1, 1999 during the foundation construction indicate that the foundation footing sizes and void form placements are in accordance with the plans and specifications for this project. Observations made on October 5, 1999 indicate that the foundation wall steel placements are in accordance with the plans and specifications for this project. Sincerely, TERRACON ��/- '044/� Connie J. Schneider, E.I.T. Geotechnical Engineer Copies to: Addressee (6) 7avid d by: Richer, P.E. Department Geotech Arizona ■ Arkansas ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri ■ Montana Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Quality Engineering Since 1965