Loading...
HomeMy WebLinkAbout6107 NORMANDY CT - MISCELLANEOUS - 1/23/1996FOUNDATION I Consulting ENGINEERING Engineers, Ltd. January 23, 1996 Commission No.: 2166-05-03-04 Mr. David Houts Cornerstone Development P.O. Box 270748 Fort Collins, Colorado 80527/�� RE: Lot 33, Huntington Hills Fourth Filing--Jr,TVormandy Court), Fort Collins, Colorado Dear Mr. Houts: We observed the corrections on the four (4) incorrectly placed caissons at the above referenced location. The walls were extended approximately eight (8) inches to sit on the two (2) southwest caissons in the garage. The remaining two (2) caissons were corrected by widening the walls to approximately sixteen (16) inches. In addition, we inspected the wall reinforcing and void material placed in all the wall forms. It is our opinion that the wall reinforcing and corrections were in substantial conformance with our previous recommendations and foundation plan, Job No. 2166-05- 03-01. If you have any questions, please feel free to call. Respectf 1e toei D. Er , Engineering Technician Review d by:: Kevin W. Patterson, P.E. FOUNDATION ENGINEERING;:CONSULTING ENGINEERS, LTD. JDE/jle 100 East 3rd Street • Loveland, Colorado 80537 • (970) 663-0138 • Fax (970) 663-1660 il5 Main Street_ Smic (- . I ongnuuv, ('Ok, ado SOSOI • (303) 702-0661