HomeMy WebLinkAbout607 PARKER ST - CORRESPONDENCE - 10/13/1977TO: City of Fort Collins
Engineering Division
RE: Lots 13-16 Bristol Subdivision
I have been informed and understand that the City of Fort Collins is
in the process of installing a sanitary relief sewer along Spring Creek
from Stover Street to Edora Park. The estimated completion date for
said sewer is February 1, 1978.
The City desires that the sanitary sewer serving Lots 13 - 16 of the
Bristol Subdivision, to be constructed on Parker Street, be connected to
the relief sewer rather than the existing sewer.
The City has indicated that they are willing to release building permits
on said lots prior to the installation of the sanitary sewer main on Parker
Street. I hereby agree to maintain a portable sanitary facility on -site
for use during construction. Furthermore, I agree that use of facilities
within the structures will not be permitted and occupancy of the structures
will not be permitted until such time that the sanitary sewer main is
installed to Stover Street by the Developer and accepted by the City.
/o—/S-r7
Date
s/
f " John C. Atkinson
209 N. Roosevelt
Fort Collins, CO 80521