Loading...
HomeMy WebLinkAbout600 E SWALLOW RD - CORRESPONDENCE - 7/23/1976L JULY 23, 1976 Mfg. PAUL M-lCHAUD, BUILDING INSPECTOR BUILIDNG DEPARTMENT, CITY OF FORT COLLINS 300 LAPORTE AVENUE FORT COLLINS, COLORADO 80521 RE: LATTER—DAY SAINTS CHURCH FORT COLLINS, COLORADO PROJECT NO. 512-2600—A DEAR MR. MICHAUD: YOU HAVE EXPRESSED CONCERN ABOUT THE BEARING CONDITION OF THE LAMINATED ROOF BEAM ON THE ABOVE PROJECT. WE NOTE THAT SECTION 2517-5 OF THE UBC, PROVIDES FOR 1/211 CLEARANCE BETWEEN TIMBER GIRDERS AND MASONRY TO PRE— VENT MOISTURE DETERIORATION OF THE GIRDER. IT IS OUR UNDERSTANDING THAT THERE IS AN AIR SPACE BETWEEN THE ENDS OF THE BEAMS AND THE ADJACENT MASONRY, THE TOP SURFACE OF THE BEAMS ARE NOT IN CONTACT WITH MASONRY AND THE SIDES AND BOTTOM SURFACES OF THE BEAMS ARE PROTECTED OVER A SUBSTANTIAL AREA BY THE STEEL BEARING SHOES. THE ENDS OF THE BEAMS WERE FACTORY TREATED WITH WOOD PRESERVATIVE AND THE FACES WITH PENE— TRATING SEALER. THE MASONRY IN THE VICINITY OF THE CONNECTION IS PROTECTED FROM MOISTURE BY ROOF AND ROOF OVERHANG. IT IS OUR OPINION THAT UNDER THE CIRCUMSTANCES THE LAMINATED ROOF BEAMS ARE ADEQUATELY PROTECTED FROM MOISTURE DETERIORATION. SINCERELY, TOWNER/LOPEZ/WELLER �'rrt /L t owner/ IOPez/ Weller . 2006 broadway, boulder, colorado 60302 • (3031 447-2813