Loading...
HomeMy WebLinkAbout4721 TECHNOLOGY PKWY - CORRESPONDENCE - 4/21/1998Coloâ–ºndo TO: Bruce Dalton, OZ Architecture FROM: Patty Swigart, Celestica Colorado COPY: Kevin Oliver, Celestica Colorado Gerry Albanese, DPR Construction SUBJECT: Certificate of Occupancy April21, 1998 The purpose of this memo is to provide a description of the anticipated move -in activity at the new Celestica Colorado facility located at 4721 Technology Parkway. This information is to be used for consideration for the Certificate of Occupancy. Dates The anticipated building construction completion date is mid -February 1999, Celestica would like to begin placing equipment inside the building as early as possible before this date. Scoot and Imuence: The three major functional areas within the building ate manufacturing, warehouse/shipping/rccciving and office. Once the majority of the utilities and inside finishes are completed and there is no risk of interference with the remaining construction schedule, equipment would be placed in their planned locations awaiting final building systems test and fit. up. It is anticipated that the sequence for equipment placement would be manufacturing first. then the warehouse and lastly office. The most likely scenario is to place one manufacturing cell in the manufacturing area and begin to level and align the equipment. In parallel, the racks in the warehouse area would be installed. Celestica personnel would formally begin to occupy the building once the Certificate of Occupancy is issued and all of the building systems have been successfully tested. We appreciate your assistance in defining the earliest possible date for equipment move -in and the conditions and requirements for the Certificate of Occupancy. For any required additional information, please contact me at 970-207-5067.