HomeMy WebLinkAbout4721 TECHNOLOGY PKWY - CORRESPONDENCE - 4/27/19981 April 24, 1998 n
_ 3
Ms. Sharon Getz
ARCHITECTURE City of Fort Collins
Building Permits and Inspection Division�(�
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Celestica Colorado �� / `��G�����)��y l� ,�'L✓ v,
Dear Ms. Getz:
Celestica is establishing a schedule for equipment move -in and systems hook-up and testing.
We identify this as the fit -up phase of the project. This work is all preparatory to building
occupancy and operation.
Enclosed is a Celestica memo relative to fit -up.
We would like to know what degree of completion, for both planning and building
construction, Fort Collins will require for fit -up to begin and how this relates to building
occupancy.
Sincerely,
Bruce Dalton
OZ Architecture
cc: Vidya Welling
Patty Swigart
Robert Macpherson
Gerry Albanese
D L N V E R
BOULDER
WINTLK PARK
2336 Pearl Sveer
Boulder, Colorado 80302
Tel. 303 • 449 • 8900
Fax 303 • 449 • 3886
COPY: - Kevin Oliver, Celestica Colorado /2'C' ?/J/D �1"
Gerry Albanese, DPR Construction
SUBJECT: Certificate of Occupancy
The purpose of this memo is to provide a description of the anticipated move -in activity at the
new Celestica Colorado facility located at 4721 Technology Parkway. This information is to be
used for consideration for the Certificate of Occupancy.
j= The anticipated building construction completion date is mid -February 1999. Celestica
would like to begin placing equipment inside the building as early as possible before this date.
Scogg and SQuence: The three major fltnctional areas within the building arc manufacturing,
watehouse/shipping/rocciving and office. Once the majority of the utilities and inside finishes are
completed and there is no risk of interference with the remaining construction schedule,
equipment would be placed in their planned locations awaiting final building systems test and fit -
up. It is anticipated that the sequence for equipment placement would be manufacturing first,
then the warehouse and lastly office. The most likely scenario is to place one manufacturing cell
in the manufacturing area and begin to level and align the equipment. In parallel, the racks in the
warehouse area would be installed. Celestica personnel would formally begin to occupy the
building once the Certificate of Occupancy is issued and all of the building systems have been
successfully tested.
we appreciate your assistance in defining the earliest possible date for equipment move -in and
the conditions and requirements for the Certificate of Occupancy. For any required additional
information, please contact me at 970-207-5067.