Loading...
HomeMy WebLinkAbout4721 S TIMBERLINE RD - SPECIAL INSPECTIONS - 9/1/2000LAWRENCE A. WICKHAM WICKHAM ROBERT J. GUSTAFSON LGUFSTAFSONDONALD G. SHIELDS COREY S. STINAR A R C H I T E C T S 1449 RIVERSIDE AVENUE (970) 493-2025 FORT COLLINS, COLORADO 80524 FAX (970) 493-2026 September 1, 2000 Mr. Dave Carlson Cottier Construction, Inc. P.O. Box 1051 Fort Collins, CO 80522 RE: Car Wash foundation inspection Schrader Oil Country Store 4711 South Timberline Road Fort Collins, CO 1� WGA Project #2574-99 V� Dear Dave, On August 31, 2000 I performed -&-foundation inspection of the rebar in thespread foe�ing for the car wash and determined that it met with the intent of the construction documents. On September 1, 2000 I performed a foundation inspection of the-rebar in the stem wall for the car wash and determined that it met with the intent of the construction documents. Sincerely, Donald Shields Jr. Project Manager � ���11t;3EAART ��J++,,. l�tilC -T yON no. 30 `u U PLAZA ENGINEER'S FIELD REPORT Report Date: September 415, 2000- Report No.: 1 Project: Schrader Country Store Location: Timberline Road and Timberwood Drive, Fort Collins, Colorado Engineer: Plaza Engineermg Consultants, Inc., Loveland, Colorado Contactor: Cottier Construction, Inc., Fort Collins, Colorado Subject: Concrete Wall Footings i Date: September 12, 2000 (12:00 pm) 4Weather: Seasonal OBSERVATIONS In general, the concrete forms were properly set and free of debris. The reinforcing steel required for the wall footings and integral pads was correctly placed, and the size of the footings and pads were consistent with the requirements of the foundation plan prepared by this office. Vertical dowels consisting_ of No. 4 Grade 60 reinforcing_ steel was also ready for placement. FIELD INSTRUCTIONS GIVEN None. cc: F Plaz�.. art PLAZA ENGINEERING CONSULTANTS, INC. P.O. Box 1002 Loveland, CO 80539-1002 (970)-663-6353 LAWRENCE A. WICKHAM +M ROBERT J. GUSTAFSON LUQ--S DONALD G. SHIELDS ON COREY S. STINAR .A R C T C T S 1449 RIVERSIDE AVENUE (970) 493-2025 FORT COLLINS, COLORADO 80524 FAX (970) 493-2026 October 5, 2000 Mr. Dave Carlson Cottier Construction, Inc. P.O. Box 1051 Fort Collins, CO 80522 RE: Canopy Footing Inspection Schrader Oil Country Store 4721 South Timberline Road Fort Collins, CO WGA Project #2574-99 Dear Dave, On September 7, 2000 I performed -a - foundation -inspection of the rebar for the fuel island canopy footings and determined that it met with the intent of the canopy footing design drawings prepared by Arning Industries. Footing -holes were 3' V diameter x 8-'-6' deep. - Footing rebar cages -were 307 diameter x 8' 0" long with (10) #6 bars vertical with 6" hooks, (3) #3 ties at 2 '/2" o.c. at the top and (8) #3 ties at 12" o.c. to bottom of cage. Sincerely, Donald Shields Jr. Project Manager LAWRENCE A. WICKHAM WICKHAM ROBERT J. GUSTAFSON DONALD G. SHIELDS GUSTAFSON COREY S. STINAR A R C H I T E C T S 1449 RIVERSIDE AVENUE (970) 493-2025 FORT COLLINS, COLORADO 80524 FAX (970) 493-2026 October 5, 2000 Mr. Dave Carlson Cottier Construction, Inc. P.O. Box 1051 Fort Collins, CO 80522 RE: Car Wash Masonry Inspections Schrader Oil Country Store 4721 South Timberline Road Fort Collins, CO WGA Project #2574-99 Dear Dave, On September 28' 2000 I performed an inspection of the first 48' (vertical) of structural masonry block for the car wash and determined that the block, rebar and grout installations met with the intent of the Construction Documents. On September 29, 20001 performed -an inspection of the second-48" (vertical) of structural masonry block for the car wash and determined that the block, rebar and grout installations met with the intent of the Construction Documents. On October 5, 2000 I performed an inspection of the structuraFinasomy block for-the-qar wash from 8'-0" a.f f. to the top of the bond beam and determined that the block, rebar and grout installations met with the intent of the Construction Documents. Sincerely, Donald Shields Jr. Project Manager