Loading...
HomeMy WebLinkAbout4425 VIEWPOINT CT - CORRESPONDENCE - 1/9/1992JAN- 8-92 WED 12:34 Woodcraft Homes FAX NO. 3036676799 P. 01 FOUNDATION 1I Consulting__1 ENGINEERING I Engineers, Ltd. October 15, 1991 Commission No. 1419-01-13-02 Woodcraft Homes 1501 North Cleveland Loveland, CO 80538 Gentlemen: We have observed the drilling of several of the ten (10) inch diameter, straight shaft piers supporting the residence under construction at -Lot 18, The Overlook at Woodridge, P.U.D., First Filing (4425 Viewpoint), a subdivision of Fort Collins, Colorado. This inspection was performed on October 10, 1991. Exposed soils consist of six (6) to eight .(8) feet of stratified gravelly sand over a silty claystone bedrock, which extends to the depths drilled, approximately eight (8) feet. All piers observed were plumb, properly cleaned, and of adequate length as specified on our foundation plan, Job No, 1419-02-01-02. No water was encountered during drilling. Although, casing was not required, we recommend that concrete be placed 'immediately after drilling of each individual caisson. If you have any questions, please call. Respectully, Kevin W. Pattej FOUNDATION ENT KWP/sbs ENGINEERS, LTD. 100 East 3rd Street • Loveland, Colorado 80537 • (303) 663-0138