Loading...
HomeMy WebLinkAbout4403 REGENCY DR - INSPECTION RESULTS - 12/30/1999City of Fort Collins FIELD VERIFICATION FOR: BUILDING PERMI' 281 N. College Avenue P.O. Box 580 Fort Collins, CO 80522 (970)221-6760 6-dASPIPE ❑ MECHANICAL REPLACEMENT JOB ADDRESS 'T yp.3 i( 2ti �,. , ,(�. DATE is INSTALLER'S NAME 151-41-11f <.,),' e ay COMPANY NAME LICENSE # (A) ' I verify that I have installed (ft. approx.) of gas pipe, tested at / 0 pounds for / S minutes, the results of which comply with 10 pounds for 15 minutes minimum. (A & B) I verify that I have installed mechanical equipment listed as in compliance with current city codes. A — Permits required B — Permits and inspections required