HomeMy WebLinkAbout4403 REGENCY DR - INSPECTION RESULTS - 12/30/1999City of Fort Collins
FIELD VERIFICATION FOR:
BUILDING PERMI'
281 N. College Avenue
P.O. Box 580
Fort Collins, CO 80522
(970)221-6760
6-dASPIPE
❑ MECHANICAL REPLACEMENT
JOB ADDRESS 'T yp.3 i( 2ti �,. , ,(�. DATE is
INSTALLER'S NAME 151-41-11f <.,),' e ay
COMPANY NAME
LICENSE #
(A) ' I verify that I have installed (ft. approx.) of gas pipe, tested at / 0
pounds for / S minutes, the results of which comply with 10
pounds for 15 minutes minimum.
(A & B) I verify that I have installed mechanical equipment listed as
in compliance with current city codes.
A — Permits required
B — Permits and inspections required