Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/16/2001 (2)Dote: Z-1 Project No. 3/oz70 *t�5 Job Foreman _WiTDE J?E g-'S7 R Piping System Tested 4145f g g4tk# PI;DIAIG V ff7RAY— 000Z 4Ab RAF eN r-OZ5*OW ���Tf{E�TBcrh�l/6E,� System Location �7� f'r���% Cl'a-zk— Reom Dates Test Performed: I (A) Started Z-lS-d/ At Id 00 A.M. (fC) I (B) Completed At A.M. ( ) Pressure Test Performed At /ZO Pressure Loss Testing Method AIR i Remarks Signed By Accepted By: i N-179 4 P.M. ( ) P.M. ( ) Natkin Contracting Foreman Resident Engineer, s Day of I City Inspector, �jP ' THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS �`�//I � FORBIDDEN EXCEPT WITH WkITTEN CONSENT, e�/ r TEST DATA ,/� DATE SCALE FILE No. I DRAWN BY I CHECKED BY I SHEET