HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/16/2001 (2)Dote: Z-1
Project No. 3/oz70 *t�5
Job Foreman _WiTDE J?E g-'S7 R
Piping System Tested 4145f g g4tk# PI;DIAIG V ff7RAY— 000Z 4Ab RAF eN r-OZ5*OW ���Tf{E�TBcrh�l/6E,�
System Location �7� f'r���% Cl'a-zk— Reom
Dates Test Performed:
I
(A) Started Z-lS-d/ At Id 00 A.M. (fC)
I
(B) Completed At A.M. ( )
Pressure Test Performed At /ZO Pressure Loss
Testing Method AIR
i
Remarks
Signed By
Accepted By:
i
N-179 4
P.M. ( )
P.M. ( )
Natkin Contracting Foreman
Resident Engineer,
s Day of I
City Inspector, �jP '
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS
�`�//I � FORBIDDEN EXCEPT WITH WkITTEN CONSENT,
e�/ r TEST DATA
,/� DATE SCALE
FILE No. I DRAWN BY I CHECKED BY I SHEET