HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/1/2001 (2)Date:
t. Prniecf
Project No. 31a�70 61`-)
Job Foreman WAD P&-COsT;1>
ti ipin g.System Tested A-44-IOOZ CO<L Act-7a Y/k � oFF� M141/�
m location StBFB L>��- 6/N� S
k$yste
Dates Test Performed:
(A) Storied At 7 00 A.M. fw P.M.
( )
(B) Completed Z L'O / At OO A.M. ( P.M.
( )
Pressure Test Performed At 100 PS / Pressure Loss
Testing Method _ AIR
i'
I
I
Remarks
I.
Signed By�.A�6",4e Nolkin Contracting Foreman
Accepted By: Resident Engineer,
_
This
Day of n6o l
City Inspector,?�_�'��
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS
FORBIDDEN EXCEPT WITH WRITTEN CONSENT.
TEST DATA
DATE SCALE
/V3 / �C-✓
Nadan Conh'acting
FILE No, DRAWN BY CHECKED BY SHEET
N-179