Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/1/2001 (2)Date: t. Prniecf Project No. 31a�70 61`-) Job Foreman WAD P&-COsT;1> ti ipin g.System Tested A-44-IOOZ CO<L Act-7a Y/k � oFF� M141/� m location StBFB L>��- 6/N� S k$yste Dates Test Performed: (A) Storied At 7 00 A.M. fw P.M. ( ) (B) Completed Z L'O / At OO A.M. ( P.M. ( ) Pressure Test Performed At 100 PS / Pressure Loss Testing Method _ AIR i' I I Remarks I. Signed By�.A�6",4e Nolkin Contracting Foreman Accepted By: Resident Engineer, _ This Day of n6o l City Inspector,?�_�'�� THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS FORBIDDEN EXCEPT WITH WRITTEN CONSENT. TEST DATA DATE SCALE /V3 / �C-✓ Nadan Conh'acting FILE No, DRAWN BY CHECKED BY SHEET N-179