Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 3/26/2001Dote: Project Act lg:�7a i 1 j — lPiping.System Tested — I .`System Location Dotes Test Perfol i (A) atortea t\T i (B) Completed At I Plressure Test Performed At Testing Method I. � Remarks 1 x \ S--5k C Signed By 1 Accepted By: Resident Engineer, I City Inspector, Project No. l L Job Foreman 1'\ H.M. t I r.M. t I A.M. ( ) P.M. ( ) rllr Pressure Loss _ _- Notkin Controcting Foreman This Day of Nc%"( C-► N, THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND All USE IS FORBIDDEN EXCEPT WITH WRITTEN CONSENT. TEST DATA DATE SCALE WIND Contacting FILE No I DRAWN BY I CHECKED BY j SHEET