Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/8/2001Date: Project / LrdAbW>�iE7s Project No. 0- 3w7m Job Foremon wtex-PECosl� I Piping.System Tested_ -'System location FAB l�V Dates Test Performed: (A) Started '� �T"Q At 3 D A.M. ( ) P.M. O ` (B) Completed At A.M. ( ) P.M. ( ) Pressure Test Performed At Pressure Loss Testing Method Remarks Signed By Natkin Contracting Foreman Accepted By: Resident Engineer, � //,, � / This _ Day ofczC L ,�. City Inspector, THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS FORBIDDEN EXCEPT WITH WRITTEN CONSENT. TEST DATA DATE I I SCALE Natlan CoiVacgng FILE No. DRAWN BY CHECKED BY SHEET N-179