HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/8/2001 (2)Dote:
Project No.
Job Foreman L�Lo51CLr�
Piping.System Tested C o L$
System Location��L "
Dates Test Performed:
(A)
Started Z-Z'o Or
At 3 00
_ A.M. (
) P.M.
(B)
Completed
At ---
A.M. (
) P.M.
( )
{Pressure Test Performed At
Testing Method
I
Remarks
9 5 F 1
tw
VF
,Eow
Pressure Loss
Signed By Natkin Contracting Foreman
Accepted By: Resident Engineer,
r � ,
This Day of
City Inspector,
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE LS
FORBIDDEN EXCEPT WITH WRITTEN CONSENT.
TEST DATA
DATE SCALE
Now Won owl
FILE No. j DRAWN BY I CHECKED BY I SHEET
N• 179