HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/20/2001 (2)Dole: Z-19-0 / — —
L5&Y IAI *-'Y F A5107 -
Project No. 3 107-70
Job Foreman Wl)E DE&o Tc ;2-
ping.$ystem Tested CvitS Cc-,>'Jf �(O/- 5 ._TU T�hfWSIP- =t� �tY/N htV3) Mi4tN5 Fz LINK �ul�?�ING _
System Location in
Dotes Test Performed:
I
I(A) Started z !q-O/ At 2 : 00 A.M. ( ) P.M, ()
j (8) Completed a/ At A.M. ( ) P.M. IXI
`I
Pressure Test Performed At 100 PS t Pressure Loss
Testing Method _
,I.
Remarks
1
Signed By _
Accepted By:
i
N•179
Resident Engineer,
ElCity Inspector,
Ngtkin Contracting Foreman
Day of
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS
TEST DATA
SCALE
DATE Nallan C09MCNI
FILE No. I DRAWN BY I CHECKED BY i $MEET