HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 2/20/2001Project No. l a) O
Job Foreman
r
N-
--Piiping.System Tested ` ,1 n
-,System Location ` -t a ,le II 1 �E10.C�C t t' V . i h CIriL��2l r►.. A 1_ )o41 !!0o Tl 0nq . 1 OoS , Qdb3.2 d0'JL
-•.I OLM M A 14 1004
Dates Test Performed:
(A)
Started `•" Q�p J� 01
At _�_ :
0 Q A.M. (
) P.M. (X)
(B)
Completed )~e6 la( 0 k
At
00 A.M. (
) P.M. (�()
I
Prossure Test Performed At Zc2 d Pressure Loss
Testing Method Dmpnesse ay- o.tex Suo-O b u�o�leS
,I.
Remarks
Signed B�
Accepted By:
I
N-179
Natkin Contracting Foreman
Resident Engineer,
City Inspecto�7 This
r, �/ %��
Day of
REP
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS
TEST DATA
DATE SCALE
MINOR CoWaCUng
FILE No. DRAWN BY I CHECKED BY SHEET