HomeMy WebLinkAbout4380 ZIEGLER RD - INSPECTION RESULTS - 3/9/2001Project No. 3� O 2-7 0
Project Os.re-S V,19� r f Job Foreman
Piping.System Tested /WSSl36 41i4 4!,� lice LG �v 'Cs�— / %Gr �✓d S Lr/z ✓! e�%' L�=-tome C.
*System Location,CkrJZ✓r C If L>(/LrL
Dotes Test Performed:
I
(A) Started At A.M. ( P.M. ( )
I
(B) Completed At a A.M. ( ) PM. (�)
i
Pressure Test Performed At / r1 _ Pressure Loss 1t/aivGJ
Testing Method / A.
i
Remorks
Signed
I
Accepted By:
I
N• 179
Resident Engineer,
City inspector, u
4et.�
Em
-P4 a,, � e, d
Natkin Contracting Foreman
r
This Day of
THIS IS THE PERSONAL PROPERTY OF NATKIN CONTRACTING AND ALL USE IS
DATE
FILE No
TEST DATA
SCALE
Nalan CoWacing
DRAWN BY I CHECKED BY I SHEET