Loading...
HomeMy WebLinkAbout424 STARLING ST - CORRESPONDENCE - 12/9/19831 -7 L � ge" D I T, ENGINEERING P.C. 7 Decemver 9, 1983 Project Number I-83144 Mr. Joel Hayes American Builders 15150 E. I.liff Aurora, Colorado 80014 RE: HEADER ABOVE 8'-7" SPAN FROM FOUNDATION WALL TO OFF -SET SPREAD FOOTING ON THE MODEL #404 Dear Mr. Hayes: At your request, I performed calculations to clarify the required capacity of the header beams on the Model. #404. The beams in question are at the approximate center (front to back), and on the side opposite the garage. The required beam strength of 4- 2x10's is shown on the foundation drawings. This is the correct composite beam that is required to resolve the roof loads into the foundation wall and the spread footing. The item that is not clearly shown on the foundation drawing, is that this beam can be comprised of two separate beams of 2-2x10's stacked vertically. This detail would be 2-2x10 at the second floor level, 2-2x10 at the first floor level with a solid stud wall between them. This is the equivalent of 4-2x10's at the top of the foundation wall. Please call our office if we may be of further assistance. �\ncerely, —II a Gary L. Bolte, President encl: billing statement f v/?���77`�, `y �6B/��j V:•'(' ate s 16095 V a W: s 3095 SOUTH PARKER RD., SUITE 200 • AURORA, COLORADO 80014 • (303) 752-3805 p .. —_ Ys� r�Vp' ,�� ,,.y":,y, d a '_A _ ... 'M.r it5drti i•.� �.`'�'.pF 4 o W I