HomeMy WebLinkAbout415 RED HAWK DR - INSPECTION RESULTS - 8/24/2001Building and Zoning Department
281 N. College Ave.
Fort Collins, CO 80524
970/221-6760
INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION
HIRED BY —
INSPECTOR _
ADDRESS OF
roff� mil i11MA111730TiIff"_
Rim
Codes: Pass = ✓
Fail = O
PHONE
CQRMC #
7IP a
PHONE
E
Not annlicahlp =NA
INSPECTION #1
INSPECTIONS #2 and #3
SYSTEM APPROVED:xEES
COMPONENTS
Baling of openings, penetrations,
TYPE OF FOUNDATION
�r� { NO
(/ l
_crawl space
asement
joints
erforated floor vent pipe
DAT
_slab on grade
_ " PVC radon vent pipe
Comments —
diffusion retarder membrane
TYPE OF SYSTEM BEING INSTALLED
_Passive sub -membrane system
_Active sub -membrane system
Passive system - sub slab
_Active system -sub slab
_combined radon system
_membrane sealed to wall & fixtures
PVC pipe sealed at all penetrations
& connections
Firewall sleeves installed
ystem labeled inside ant o0[S1t1�'
System accessible for repair or
��installation of fan
electrical connections for fan
COMPONENTS - sub slab/ basement
4 inches aggregate or perforated
termination of system meets
standard
resistant screen at end of
pipe or collection mat
_corrosion
discharge pipe (% to''/2 openings)
_diffusion retarder (not required
_fan properly installed outside living
where sealing has occurred)
tee fitting
space
_Manometer or other US EPA
perforated vent pipes (min. 10 ft.)
approved monitoring device installed
I Make-up air vents
CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my knowledge and professional ability, I
have inspected the above -described radon mitigation system and have found it to be installed in accordance with
the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or her persons in connection with the installation, operation, or
maintenance of such radon mitigation syste
SIGNATURE OF INSPECTOR I "' DATE
White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources