HomeMy WebLinkAbout1418 ASH DR - INSPECTION RESULTS - 6/11/1985Do not occupy this budding until all required
inspections have been signed and you have obtained
A CERTIFICATE OF OCCUPANCY
Address L"T/U
General Contractor
Electrical —___
Heating —
Plumbing
Gas Piping
CITY OF FORT COLLINS
BUILDING INSPECTION DIVISION
Inspection Request 221-6769 x3"
Post This Card At or Near ui ing ion
RECORD OF INSPECTIONS
TYPE OF
INSPECTION _ INSPECTOR APPROVAL_ DATE
Setback & Footing
Foundation
Rough in Underground Plumbing.
Rough Heating
Bldg Sewer
Water Service
Gas Line Air Test
Elec Rough in
Elec Energize
Top Out Water Test _ �^
Frame & Roof
Fireplace
Fire Dept Approval
Final Inspection (Building only)
Foundation Location
Front Setback Right Side
Rear Setback Left Side Y
Off Street Parking Required _
Inspectors Comments &
Additional Inspections
Minimum Required Interrupting
CapacityWill Be__ —
Ptirrmt Datee
Da
Type of Work
lus9—
ftgType 0, cc Grgup
,NgStogies
A.E
'111AME=-
Check for Engineering Clearance Prior to Requesting Final Inspection 221-6605--(New construction only)
INSPECTION RECORD
(For Departmental Use Only)
Inspection
Date
Inspector
Comments
m
r=
m
Setback & Footing
Foundation
DFC b `���
Frame & Roofing
Garage Fireproofing
'POy
Fireplace
ro
Wallboard
Garage Footings
Garage Foundation
Final
a
=
Rough
Temp.
Final
ca'
E
_z
d
Sewer
Water
Rough In
Water Test
Gas
Final
o
u
Z
u
w
w
Underground
Rough
.�
Energize
Final
n
o
w
Fire Protection
Fsa
..r
5�1
Final
c
a
Q
L
r
r'
O
U
N_
Correction Order Left
Stop Order Issued
Stop Order Released
Certificate of Occupancy
Sidewalk, Curb, Gutter & Street
Site Plan