HomeMy WebLinkAbout1418 ASH DR - INSPECTION RESULTS - 9/3/1982a
Do not occupy this building until all required
inspections have been signed and you have obtained
A CERTIFICATE OF OCCUPANCY
41 Address f -
General Contractor
Electrical
Heating
Plumbing
Gas Piping
TYPE OF
RECORD OF INSPECTIONS
A j. � ,
CITY OF FORT COLLI ;S° I Permit0
BUILDING INSPECTIOWDIVISION ; 1 Date
Inspection Request 493-1061,€_._r_ _ r
Post This Card At or Near Building FrgO,A� �r Tork
rRH
se l—tAa:a �. b
Const.Type o Occ.Group A�
® No. Stories_
INSPECTOR APPROVAL DATE
Setback &Footing
Foundation _
Rough -in Underground Plumbing
i
Rough Heating , _—..—.
Bldg. Sewer_
ppI�
Water Service _
—-_—___Y
Gas Line Air Test
Elec. Rough -in—
Elec. Energize _
Top Out Water Test ---
Frame & Roof—_eE,4. u,c_
41zzl ,
Fire Dept. Approval _
'Final Inspection _
Foundation Location:
Front Setback Right Side
Rear Setback Left Side Y
Off Street Parking Required
Inspector's Comments &
Additional Inspections
Minimum Required Interrupting
Capacity Will Be
'Check for Engineering Clearance Prior to Requesting Final Inspection. 484.4220 Ext. 728 — (New construction only)
INSPECTION RECORD
(For Departmental Use Only)
Address !
Plumbing Permit_
Heating Permit_
Electrical Permit
Inspection
Date
Inspector
Setback & Footing
JUN 8 1983
RON
Foundation i
p
Frame & Roofing
Garage Fireproofing
M
Fireplace
c
Wallboard
Garage Footings
ca
Garage Foundation
Final
Rough
Temp.
=
Final
Sewer
O
c
Water
Rough In
E
Water Test
a
Gas
Final
a
Underground
V
Rough
u
°i
Energize
w
Final
Correction Order Left
(Stop Order Issued
Stop Order Released
Certificate of Occupancy
Sidewalk, Curb, Gutter & Street
Landscape
SEP 0 3 l982
n Building Permit
G.P. No. e}i Q5
GIVE BRIEF REPORT OF SPECIAL OR UNUSUAL CONDITIONS
Z� Nit k: 0^4
•!-lv5 SCS